TGI S.A. ESP. se permite informar los cargos regulados de transporte de gas natural a través de los gasoductos que administra:
Actualizado Abril/2026
Resolución CREG 102 010 de 2022 – Tarifa aplicada de enero a marzo de 2026
| Tramo / Concepto | % de la Inversión Base Remunerada con Cargo Fijo | Cargo AO&M | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | ($/KPCD/A) | |
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 239.524 | 479.048 | 598.810 | 718.572 | 838.334 | 958.096 | 1.017.977 | 1.077.858 | 1.101.810 | 1.125.763 | 1.149.715 | 1.173.668 | 1.197.620 | 876.781 |
| C.V. ($/KPC) | 5.038 | 4.030 | 3.023 | 2.519 | 2.015 | 1.511 | 1.008 | 756 | 504 | 403 | 302 | 202 | 101 | - | - |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 110.290 | 220.579 | 275.724 | 330.869 | 386.014 | 441.158 | 468.731 | 496.303 | 507.332 | 518.361 | 529.390 | 540.419 | 551.448 | 211.147 |
| C.V. ($/KPC) | 3.380 | 2.704 | 2.028 | 1.690 | 1.352 | 1.014 | 676 | 507 | 338 | 270 | 203 | 135 | 68 | - | - |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.031 | 90.062 | 112.577 | 135.092 | 157.608 | 180.123 | 191.381 | 202.639 | 207.142 | 211.645 | 216.148 | 220.651 | 225.154 | 60.778 |
| C.V. ($/KPC) | 1.867 | 1.494 | 1.120 | 934 | 747 | 560 | 373 | 280 | 187 | 149 | 112 | 75 | 37 | - | - |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.164 | 214.328 | 267.910 | 321.491 | 375.073 | 428.655 | 455.446 | 482.237 | 492.953 | 503.670 | 514.386 | 525.103 | 535.819 | 158.176 |
| C.V. ($/KPC) | 2.207 | 1.766 | 1.324 | 1.104 | 883 | 662 | 441 | 331 | 221 | 177 | 132 | 88 | 44 | - | - |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 134.559 | 269.119 | 336.399 | 403.678 | 470.958 | 538.238 | 571.877 | 605.517 | 618.973 | 632.429 | 645.885 | 659.341 | 672.797 | 542.295 |
| C.V. ($/KPC) | 2.959 | 2.367 | 1.775 | 1.480 | 1.184 | 888 | 592 | 444 | 296 | 237 | 178 | 118 | 59 | - | - |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 47.520 | 95.040 | 118.800 | 142.560 | 166.320 | 190.080 | 201.960 | 213.840 | 218.592 | 223.344 | 228.096 | 232.848 | 237.600 | 186.187 |
| C.V. ($/KPC) | 1.102 | 882 | 661 | 551 | 441 | 331 | 220 | 165 | 110 | 88 | 66 | 44 | 22 | - | - |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 109.620 | 219.240 | 274.050 | 328.859 | 383.669 | 438.479 | 465.884 | 493.289 | 504.251 | 515.213 | 526.175 | 537.137 | 548.099 | 417.333 |
| C.V. ($/KPC) | 2.642 | 2.114 | 1.585 | 1.321 | 1.057 | 793 | 528 | 396 | 264 | 211 | 159 | 106 | 53 | - | - |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 372.608 | 745.216 | 931.520 | 1.117.824 | 1.304.128 | 1.490.432 | 1.583.584 | 1.676.736 | 1.713.997 | 1.751.258 | 1.788.518 | 1.825.779 | 1.863.040 | 388.744 |
| C.V. ($/KPC) | 5.417 | 4.334 | 3.250 | 2.709 | 2.167 | 1.625 | 1.083 | 813 | 542 | 433 | 325 | 217 | 108 | - | - |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.354.101 | 2.708.202 | 3.385.253 | 4.062.304 | 4.739.354 | 5.416.405 | 5.754.930 | 6.093.455 | 6.228.866 | 6.364.276 | 6.499.686 | 6.635.096 | 6.770.506 | 936.177 |
| C.V. ($/KPC) | 20.650 | 16.520 | 12.390 | 10.325 | 8.260 | 6.195 | 4.130 | 3.098 | 2.065 | 1.652 | 1.239 | 826 | 413 | - | - |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 120.840 | 241.680 | 302.100 | 362.519 | 422.939 | 483.359 | 513.569 | 543.779 | 555.863 | 567.947 | 580.031 | 592.115 | 604.199 | 111.086 |
| C.V. ($/KPC) | 2.496 | 1.997 | 1.498 | 1.248 | 998 | 749 | 499 | 374 | 250 | 200 | 150 | 100 | 50 | - | - |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 81.227 | 162.453 | 203.067 | 243.680 | 284.293 | 324.906 | 345.213 | 365.520 | 373.642 | 381.765 | 389.888 | 398.010 | 406.133 | 76.961 |
| C.V. ($/KPC) | 1.516 | 1.213 | 910 | 758 | 606 | 455 | 303 | 227 | 152 | 121 | 91 | 61 | 30 | - | - |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 226.656 | 453.313 | 566.641 | 679.969 | 793.297 | 906.626 | 963.290 | 1.019.954 | 1.042.619 | 1.065.285 | 1.087.951 | 1.110.616 | 1.133.282 | 252.930 |
| C.V. ($/KPC) | 4.361 | 3.489 | 2.617 | 2.181 | 1.744 | 1.308 | 872 | 654 | 436 | 349 | 262 | 174 | 87 | - | - |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 143.914 | 287.828 | 359.785 | 431.742 | 503.699 | 575.656 | 611.635 | 647.613 | 662.004 | 676.396 | 690.787 | 705.179 | 719.570 | 348.928 |
| C.V. ($/KPC) | 2.039 | 1.631 | 1.223 | 1.020 | 816 | 612 | 408 | 306 | 204 | 163 | 122 | 82 | 41 | - | - |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 161.138 | 322.275 | 402.844 | 483.413 | 563.982 | 644.550 | 684.835 | 725.119 | 741.233 | 757.347 | 773.460 | 789.574 | 805.688 | 355.598 |
| C.V. ($/KPC) | 2.206 | 1.765 | 1.324 | 1.103 | 882 | 662 | 441 | 331 | 221 | 176 | 132 | 88 | 44 | - | - |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.826 | 233.651 | 292.064 | 350.477 | 408.890 | 467.302 | 496.509 | 525.715 | 537.398 | 549.080 | 560.763 | 572.445 | 584.128 | 145.395 |
| C.V. ($/KPC) | 1.729 | 1.383 | 1.037 | 865 | 692 | 519 | 346 | 259 | 173 | 138 | 104 | 69 | 35 | - | - |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 128.342 | 256.684 | 320.855 | 385.025 | 449.196 | 513.367 | 545.453 | 577.538 | 590.372 | 603.206 | 616.041 | 628.875 | 641.709 | 150.522 |
| C.V. ($/KPC) | 1.758 | 1.406 | 1.055 | 879 | 703 | 527 | 352 | 264 | 176 | 141 | 105 | 70 | 35 | - | - |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 174.282 | 348.564 | 435.705 | 522.845 | 609.986 | 697.127 | 740.698 | 784.268 | 801.696 | 819.124 | 836.553 | 853.981 | 871.409 | 539.854 |
| C.V. ($/KPC) | 3.142 | 2.514 | 1.885 | 1.571 | 1.257 | 943 | 628 | 471 | 314 | 251 | 189 | 126 | 63 | - | - |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 38.988 | 77.975 | 97.469 | 116.963 | 136.457 | 155.950 | 165.697 | 175.444 | 179.343 | 183.242 | 187.140 | 191.039 | 194.938 | 57.927 |
| C.V. ($/KPC) | 757 | 606 | 454 | 379 | 303 | 227 | 151 | 114 | 76 | 61 | 45 | 30 | 15 | - | - |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | N/A | ||||||||||||||
| C.V. ($/KPC) | N/A | ||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.745 | 41.490 | 51.863 | 62.236 | 72.608 | 82.981 | 88.167 | 93.353 | 95.428 | 97.502 | 99.577 | 101.651 | 103.726 | 17.210 |
| C.V. ($/KPC) | 396 | 317 | 238 | 198 | 158 | 119 | 79 | 59 | 40 | 32 | 24 | 16 | 8 | - | - |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 93.525 | 187.050 | 233.813 | 280.575 | 327.338 | 374.100 | 397.481 | 420.863 | 430.215 | 439.568 | 448.920 | 458.273 | 467.625 | 276.944 |
| C.V. ($/KPC) | 1.709 | 1.367 | 1.025 | 855 | 684 | 513 | 342 | 256 | 171 | 137 | 103 | 68 | 34 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.661.885 | |||||||||||||
| C.V. ($/KPC) | - | - | |||||||||||||
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2025
Aplicados de enero a marzo de 2026
Estos Cargos se han calculado con base en el Índice de Precios al Consumidor (IPC) e índice de Precios al Productor Oferta Interna (IPP), reportados por el DANE a diciembre de 2025 y acorde a última actualización realizada en el mes de febrero de 2026.
Estos cargos actualizan los cargos publicados en los meses de diciembre de 2025 y enero de 2026, para los servicios de los meses de enero y febrero de 2026, conforme a indexación última reportada por el DANE.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Resolución CREG 102 010 de 2022 – Tarifa aplicada de enero a marzo de 2026
| Tramo / Concepto | % de la Inversión Base Remunerada con Cargo Fijo | Cargo AO&M | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | ($/KPCD/A) | |
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 239.524 | 479.048 | 598.810 | 718.572 | 838.334 | 958.096 | 1.017.977 | 1.077.858 | 1.101.810 | 1.125.763 | 1.149.715 | 1.173.668 | 1.197.620 | 876.781 |
| C.V. ($/KPC) | 5.038 | 4.030 | 3.023 | 2.519 | 2.015 | 1.511 | 1.008 | 756 | 504 | 403 | 302 | 202 | 101 | - | - |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 110.290 | 220.579 | 275.724 | 330.869 | 386.014 | 441.158 | 468.731 | 496.303 | 507.332 | 518.361 | 529.390 | 540.419 | 551.448 | 211.147 |
| C.V. ($/KPC) | 3.380 | 2.704 | 2.028 | 1.690 | 1.352 | 1.014 | 676 | 507 | 338 | 270 | 203 | 135 | 68 | - | - |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.031 | 90.062 | 112.577 | 135.092 | 157.608 | 180.123 | 191.381 | 202.639 | 207.142 | 211.645 | 216.148 | 220.651 | 225.154 | 60.778 |
| C.V. ($/KPC) | 1.867 | 1.494 | 1.120 | 934 | 747 | 560 | 373 | 280 | 187 | 149 | 112 | 75 | 37 | - | - |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.164 | 214.328 | 267.910 | 321.491 | 375.073 | 428.655 | 455.446 | 482.237 | 492.953 | 503.670 | 514.386 | 525.103 | 535.819 | 158.176 |
| C.V. ($/KPC) | 2.207 | 1.766 | 1.324 | 1.104 | 883 | 662 | 441 | 331 | 221 | 177 | 132 | 88 | 44 | - | - |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 134.559 | 269.119 | 336.399 | 403.678 | 470.958 | 538.238 | 571.877 | 605.517 | 618.973 | 632.429 | 645.885 | 659.341 | 672.797 | 542.295 |
| C.V. ($/KPC) | 2.959 | 2.367 | 1.775 | 1.480 | 1.184 | 888 | 592 | 444 | 296 | 237 | 178 | 118 | 59 | - | - |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 47.520 | 95.040 | 118.800 | 142.560 | 166.320 | 190.080 | 201.960 | 213.840 | 218.592 | 223.344 | 228.096 | 232.848 | 237.600 | 186.187 |
| C.V. ($/KPC) | 1.102 | 882 | 661 | 551 | 441 | 331 | 220 | 165 | 110 | 88 | 66 | 44 | 22 | - | - |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 109.620 | 219.240 | 274.050 | 328.859 | 383.669 | 438.479 | 465.884 | 493.289 | 504.251 | 515.213 | 526.175 | 537.137 | 548.099 | 417.333 |
| C.V. ($/KPC) | 2.642 | 2.114 | 1.585 | 1.321 | 1.057 | 793 | 528 | 396 | 264 | 211 | 159 | 106 | 53 | - | - |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 372.608 | 745.216 | 931.520 | 1.117.824 | 1.304.128 | 1.490.432 | 1.583.584 | 1.676.736 | 1.713.997 | 1.751.258 | 1.788.518 | 1.825.779 | 1.863.040 | 388.744 |
| C.V. ($/KPC) | 5.417 | 4.334 | 3.250 | 2.709 | 2.167 | 1.625 | 1.083 | 813 | 542 | 433 | 325 | 217 | 108 | - | - |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.354.101 | 2.708.202 | 3.385.253 | 4.062.304 | 4.739.354 | 5.416.405 | 5.754.930 | 6.093.455 | 6.228.866 | 6.364.276 | 6.499.686 | 6.635.096 | 6.770.506 | 936.177 |
| C.V. ($/KPC) | 20.650 | 16.520 | 12.390 | 10.325 | 8.260 | 6.195 | 4.130 | 3.098 | 2.065 | 1.652 | 1.239 | 826 | 413 | - | - |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 120.840 | 241.680 | 302.100 | 362.519 | 422.939 | 483.359 | 513.569 | 543.779 | 555.863 | 567.947 | 580.031 | 592.115 | 604.199 | 111.086 |
| C.V. ($/KPC) | 2.496 | 1.997 | 1.498 | 1.248 | 998 | 749 | 499 | 374 | 250 | 200 | 150 | 100 | 50 | - | - |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 81.227 | 162.453 | 203.067 | 243.680 | 284.293 | 324.906 | 345.213 | 365.520 | 373.642 | 381.765 | 389.888 | 398.010 | 406.133 | 76.961 |
| C.V. ($/KPC) | 1.516 | 1.213 | 910 | 758 | 606 | 455 | 303 | 227 | 152 | 121 | 91 | 61 | 30 | - | - |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 226.656 | 453.313 | 566.641 | 679.969 | 793.297 | 906.626 | 963.290 | 1.019.954 | 1.042.619 | 1.065.285 | 1.087.951 | 1.110.616 | 1.133.282 | 252.930 |
| C.V. ($/KPC) | 4.361 | 3.489 | 2.617 | 2.181 | 1.744 | 1.308 | 872 | 654 | 436 | 349 | 262 | 174 | 87 | - | - |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 143.914 | 287.828 | 359.785 | 431.742 | 503.699 | 575.656 | 611.635 | 647.613 | 662.004 | 676.396 | 690.787 | 705.179 | 719.570 | 348.928 |
| C.V. ($/KPC) | 2.039 | 1.631 | 1.223 | 1.020 | 816 | 612 | 408 | 306 | 204 | 163 | 122 | 82 | 41 | - | - |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 161.138 | 322.275 | 402.844 | 483.413 | 563.982 | 644.550 | 684.835 | 725.119 | 741.233 | 757.347 | 773.460 | 789.574 | 805.688 | 355.598 |
| C.V. ($/KPC) | 2.206 | 1.765 | 1.324 | 1.103 | 882 | 662 | 441 | 331 | 221 | 176 | 132 | 88 | 44 | - | - |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.826 | 233.651 | 292.064 | 350.477 | 408.890 | 467.302 | 496.509 | 525.715 | 537.398 | 549.080 | 560.763 | 572.445 | 584.128 | 145.395 |
| C.V. ($/KPC) | 1.729 | 1.383 | 1.037 | 865 | 692 | 519 | 346 | 259 | 173 | 138 | 104 | 69 | 35 | - | - |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 128.342 | 256.684 | 320.855 | 385.025 | 449.196 | 513.367 | 545.453 | 577.538 | 590.372 | 603.206 | 616.041 | 628.875 | 641.709 | 150.522 |
| C.V. ($/KPC) | 1.758 | 1.406 | 1.055 | 879 | 703 | 527 | 352 | 264 | 176 | 141 | 105 | 70 | 35 | - | - |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 174.282 | 348.564 | 435.705 | 522.845 | 609.986 | 697.127 | 740.698 | 784.268 | 801.696 | 819.124 | 836.553 | 853.981 | 871.409 | 539.854 |
| C.V. ($/KPC) | 3.142 | 2.514 | 1.885 | 1.571 | 1.257 | 943 | 628 | 471 | 314 | 251 | 189 | 126 | 63 | - | - |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 38.988 | 77.975 | 97.469 | 116.963 | 136.457 | 155.950 | 165.697 | 175.444 | 179.343 | 183.242 | 187.140 | 191.039 | 194.938 | 57.927 |
| C.V. ($/KPC) | 757 | 606 | 454 | 379 | 303 | 227 | 151 | 114 | 76 | 61 | 45 | 30 | 15 | - | - |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | N/A | ||||||||||||||
| C.V. ($/KPC) | N/A | ||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.745 | 41.490 | 51.863 | 62.236 | 72.608 | 82.981 | 88.167 | 93.353 | 95.428 | 97.502 | 99.577 | 101.651 | 103.726 | 17.210 |
| C.V. ($/KPC) | 396 | 317 | 238 | 198 | 158 | 119 | 79 | 59 | 40 | 32 | 24 | 16 | 8 | - | - |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 93.525 | 187.050 | 233.813 | 280.575 | 327.338 | 374.100 | 397.481 | 420.863 | 430.215 | 439.568 | 448.920 | 458.273 | 467.625 | 276.944 |
| C.V. ($/KPC) | 1.709 | 1.367 | 1.025 | 855 | 684 | 513 | 342 | 256 | 171 | 137 | 103 | 68 | 34 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.661.885 | |||||||||||||
| C.V. ($/KPC) | - | - | |||||||||||||
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2025
Aplicados de enero a marzo de 2026
Estos Cargos se han calculado con base en el Índice de Precios al Consumidor (IPC) e índice de Precios al Productor Oferta Interna (IPP), reportados por el DANE a diciembre de 2025 y acorde a última actualización realizada en el mes de febrero de 2026.
Estos cargos actualizan los cargos publicados en los meses de diciembre de 2025 y enero de 2026, para los servicios de los meses de enero y febrero de 2026, conforme a indexación última reportada por el DANE.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Resolución CREG 102 010 de 2022 – Tarifa provisional aplicada en enero y febrero de 2026
| Tramo / Concepto | % de la Inversión Base Remunerada con Cargo Fijo | Cargo AO&M | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | ($/KPCD/A) | |
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 239.643 | 479.286 | 599.108 | 718.930 | 838.751 | 958.573 | 1.018.484 | 1.078.394 | 1.102.359 | 1.126.323 | 1.150.287 | 1.174.252 | 1.198.216 | 876.781 |
| C.V. ($/KPC) | 5.041 | 4.033 | 3.025 | 2.521 | 2.016 | 1.512 | 1.008 | 756 | 504 | 403 | 302 | 202 | 101 | - | - |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 110.344 | 220.689 | 275.861 | 331.033 | 386.205 | 441.378 | 468.964 | 496.550 | 507.584 | 518.619 | 529.653 | 540.688 | 551.722 | 211.147 |
| C.V. ($/KPC) | 3.381 | 2.705 | 2.029 | 1.691 | 1.352 | 1.014 | 676 | 507 | 338 | 270 | 203 | 135 | 68 | - | - |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.053 | 90.106 | 112.633 | 135.160 | 157.686 | 180.213 | 191.476 | 202.739 | 207.245 | 211.750 | 216.255 | 220.761 | 225.266 | 60.778 |
| C.V. ($/KPC) | 1.868 | 1.494 | 1.121 | 934 | 747 | 560 | 374 | 280 | 187 | 149 | 112 | 75 | 37 | - | - |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.217 | 214.434 | 268.043 | 321.651 | 375.260 | 428.868 | 455.672 | 482.477 | 493.198 | 503.920 | 514.642 | 525.363 | 536.085 | 158.176 |
| C.V. ($/KPC) | 2.208 | 1.766 | 1.325 | 1.104 | 883 | 662 | 442 | 331 | 221 | 177 | 132 | 88 | 44 | - | - |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 134.626 | 269.252 | 336.566 | 403.879 | 471.192 | 538.505 | 572.161 | 605.818 | 619.281 | 632.743 | 646.206 | 659.668 | 673.131 | 542.295 |
| C.V. ($/KPC) | 2.960 | 2.368 | 1.776 | 1.480 | 1.184 | 888 | 592 | 444 | 296 | 237 | 178 | 118 | 59 | - | - |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 47.544 | 95.087 | 118.859 | 142.631 | 166.403 | 190.174 | 202.060 | 213.946 | 218.701 | 223.455 | 228.209 | 232.964 | 237.718 | 186.187 |
| C.V. ($/KPC) | 1.102 | 882 | 661 | 551 | 441 | 331 | 220 | 165 | 110 | 88 | 66 | 44 | 22 | - | - |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 109.674 | 219.349 | 274.186 | 329.023 | 383.860 | 438.698 | 466.116 | 493.535 | 504.502 | 515.470 | 526.437 | 537.405 | 548.372 | 417.333 |
| C.V. ($/KPC) | 2.644 | 2.115 | 1.586 | 1.322 | 1.058 | 793 | 529 | 397 | 264 | 212 | 159 | 106 | 53 | - | - |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 372.793 | 745.586 | 931.983 | 1.118.380 | 1.304.776 | 1.491.173 | 1.584.371 | 1.677.569 | 1.714.849 | 1.752.128 | 1.789.407 | 1.826.687 | 1.863.966 | 388.744 |
| C.V. ($/KPC) | 5.420 | 4.336 | 3.252 | 2.710 | 2.168 | 1.626 | 1.084 | 813 | 542 | 434 | 325 | 217 | 108 | - | - |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.354.775 | 2.709.549 | 3.386.937 | 4.064.324 | 4.741.711 | 5.419.098 | 5.757.792 | 6.096.486 | 6.231.963 | 6.367.441 | 6.502.918 | 6.638.396 | 6.773.873 | 936.177 |
| C.V. ($/KPC) | 20.660 | 16.528 | 12.396 | 10.330 | 8.264 | 6.198 | 4.132 | 3.099 | 2.066 | 1.653 | 1.240 | 826 | 413 | - | - |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 120.900 | 241.800 | 302.250 | 362.700 | 423.150 | 483.600 | 513.825 | 544.050 | 556.140 | 568.230 | 580.320 | 592.410 | 604.500 | 111.086 |
| C.V. ($/KPC) | 2.498 | 1.998 | 1.499 | 1.249 | 999 | 749 | 500 | 375 | 250 | 200 | 150 | 100 | 50 | - | - |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 81.267 | 162.534 | 203.168 | 243.801 | 284.435 | 325.068 | 345.385 | 365.702 | 373.828 | 381.955 | 390.082 | 398.208 | 406.335 | 76.961 |
| C.V. ($/KPC) | 1.517 | 1.214 | 910 | 759 | 607 | 455 | 303 | 228 | 152 | 121 | 91 | 61 | 30 | - | - |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 226.769 | 453.538 | 566.923 | 680.308 | 793.692 | 907.077 | 963.769 | 1.020.461 | 1.043.138 | 1.065.815 | 1.088.492 | 1.111.169 | 1.133.846 | 252.930 |
| C.V. ($/KPC) | 4.363 | 3.490 | 2.618 | 2.182 | 1.745 | 1.309 | 873 | 654 | 436 | 349 | 262 | 175 | 87 | - | - |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 143.985 | 287.971 | 359.964 | 431.956 | 503.949 | 575.942 | 611.938 | 647.934 | 662.333 | 676.731 | 691.130 | 705.528 | 719.927 | 348.928 |
| C.V. ($/KPC) | 2.040 | 1.632 | 1.224 | 1.020 | 816 | 612 | 408 | 306 | 204 | 163 | 122 | 82 | 41 | - | - |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 161.218 | 322.435 | 403.044 | 483.653 | 564.262 | 644.870 | 685.175 | 725.479 | 741.601 | 757.723 | 773.844 | 789.966 | 806.088 | 355.598 |
| C.V. ($/KPC) | 2.207 | 1.766 | 1.324 | 1.104 | 883 | 662 | 441 | 331 | 221 | 177 | 132 | 88 | 44 | - | - |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.884 | 233.767 | 292.209 | 350.651 | 409.093 | 467.534 | 496.755 | 525.976 | 537.665 | 549.353 | 561.041 | 572.730 | 584.418 | 145.395 |
| C.V. ($/KPC) | 1.729 | 1.383 | 1.037 | 865 | 692 | 519 | 346 | 259 | 173 | 138 | 104 | 69 | 35 | - | - |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 128.406 | 256.811 | 321.014 | 385.217 | 449.420 | 513.622 | 545.724 | 577.825 | 590.666 | 603.506 | 616.347 | 629.187 | 642.028 | 150.522 |
| C.V. ($/KPC) | 1.759 | 1.407 | 1.055 | 880 | 704 | 528 | 352 | 264 | 176 | 141 | 106 | 70 | 35 | - | - |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 174.369 | 348.737 | 435.922 | 523.106 | 610.290 | 697.474 | 741.067 | 784.659 | 802.096 | 819.532 | 836.969 | 854.406 | 871.843 | 539.854 |
| C.V. ($/KPC) | 3.143 | 2.514 | 1.886 | 1.572 | 1.257 | 943 | 629 | 471 | 314 | 251 | 189 | 126 | 63 | - | - |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 39.007 | 78.014 | 97.517 | 117.020 | 136.524 | 156.027 | 165.779 | 175.531 | 179.431 | 183.332 | 187.233 | 191.133 | 195.034 | 57.927 |
| C.V. ($/KPC) | 757 | 606 | 454 | 379 | 303 | 227 | 151 | 114 | 76 | 61 | 45 | 30 | 15 | - | - |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | N/A | ||||||||||||||
| C.V. ($/KPC) | N/A | ||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.755 | 41.511 | 51.889 | 62.266 | 72.644 | 83.022 | 88.210 | 93.399 | 95.475 | 97.550 | 99.626 | 101.701 | 103.777 | 17.210 |
| C.V. ($/KPC) | 396 | 317 | 238 | 198 | 158 | 119 | 79 | 59 | 40 | 32 | 24 | 16 | 8 | - | - |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 93.572 | 187.143 | 233.929 | 280.715 | 327.501 | 374.286 | 397.679 | 421.072 | 430.429 | 439.787 | 449.144 | 458.501 | 467.858 | 276.944 |
| C.V. ($/KPC) | 1.710 | 1.368 | 1.026 | 855 | 684 | 513 | 342 | 257 | 171 | 137 | 103 | 68 | 34 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.661.885 | |||||||||||||
| C.V. ($/KPC) | - | - | |||||||||||||
Cargos Provisionales Resolución CREG 102 010 de 2022 a DIC de 2025
Aplicados en enero y febrero de 2026
*Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP), reportados por el DANE en el mes de diciembre de 2025; donde el IPP reportado por el DANE ha brindado una Cifra Provisional. Una vez se cuente con la Cifra Oficial del IPP, se realizará la publicación de las tarifas utilizando los indexadores definitivos publicados por el DANE.
Estos cargos actualizan los cargos publicados en el mes de diciembre de 2025 para el servicio de transporte en el mes de enero de 2026, dada la publicación de indexadores en el mes de enero de 2026 emitidos por el DANE.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Aplicados en diciembre de 2025
Estos Cargos Provisionales se han actualizado con base en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE para el mes de diciembre de 2024; toda vez que a la fecha no se cuenta con los indexadores de IPP e IPC que deben ser publicados por el DANE para diciembre de 2025.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Aplicados en noviembre de 2025
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
Aplicados en noviembre de 2025
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2024
APLICADOS EN OCTUBRE DE 2025
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Cargos Resolución CREG 102 010 de 2022
APLICADOS EN SEPTIEMBRE DE 2025
APLICABLE DEL 1 AL 30 DE SEPTIEMBRE DE 2025
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS A PARTIR DE AGOSTO 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN AGOSTO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE en el mes de diciembre de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS A PARTIR DE JULIO 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN JULIO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE en el mes de diciembre de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS A PARTIR DE JUNIO 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN JUNIO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE en el mes de diciembre de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS A PARTIR DE MAYO 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN MAYO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE en el mes de diciembre de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS A PARTIR DE ABRIL DE 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN ABRIL DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP) reportados por el DANE en el mes de diciembre de 2024.
Se actualiza el PPI (serie: WPSFD41312) para el mes de diciembre de 2021 de acuerdo con la U.S. Bureau of Labor Statistics.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 244.103 | 488.207 | 610.259 | 732.310 | 854.362 | 976.414 | 1.037.439 | 1.098.465 | 1.122.876 | 1.147.286 | 1.171.696 | 1.196.107 | 1.220.517 | 834.228 |
| C.V. ($/KPC) | 5.135 | 4.108 | 3.081 | 2.568 | 2.054 | 1.541 | 1.027 | 770 | 514 | 411 | 308 | 205 | 103 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.398 | 224.796 | 280.996 | 337.195 | 393.394 | 449.593 | 477.692 | 505.792 | 517.032 | 528.272 | 539.511 | 550.751 | 561.991 | 200.900 |
| C.V. ($/KPC) | 3.444 | 2.755 | 2.066 | 1.722 | 1.378 | 1.033 | 689 | 517 | 344 | 276 | 207 | 138 | 69 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.892 | 91.784 | 114.730 | 137.675 | 160.621 | 183.567 | 195.040 | 206.513 | 211.102 | 215.691 | 220.281 | 224.870 | 229.459 | 57.828 |
| C.V. ($/KPC) | 1.902 | 1.522 | 1.141 | 951 | 761 | 571 | 380 | 285 | 190 | 152 | 114 | 76 | 38 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 109.213 | 218.425 | 273.032 | 327.638 | 382.244 | 436.850 | 464.154 | 491.457 | 502.378 | 513.299 | 524.220 | 535.142 | 546.063 | 150.499 |
| C.V. ($/KPC) | 2.248 | 1.798 | 1.349 | 1.124 | 899 | 674 | 450 | 337 | 225 | 180 | 135 | 90 | 45 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 137.132 | 274.264 | 342.830 | 411.395 | 479.961 | 548.527 | 582.810 | 617.093 | 630.806 | 644.519 | 658.233 | 671.946 | 685.659 | 515.976 |
| C.V. ($/KPC) | 3.016 | 2.413 | 1.810 | 1.508 | 1.206 | 905 | 603 | 452 | 302 | 241 | 181 | 121 | 60 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 48.429 | 96.857 | 121.072 | 145.286 | 169.500 | 193.714 | 205.822 | 217.929 | 222.772 | 227.614 | 232.457 | 237.300 | 242.143 | 177.151 |
| C.V. ($/KPC) | 1.123 | 898 | 674 | 562 | 449 | 337 | 225 | 168 | 112 | 90 | 67 | 45 | 22 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 111.716 | 223.431 | 279.289 | 335.147 | 391.005 | 446.862 | 474.791 | 502.720 | 513.892 | 525.063 | 536.235 | 547.406 | 558.578 | 397.079 |
| C.V. ($/KPC) | 2.692 | 2.154 | 1.615 | 1.346 | 1.077 | 808 | 538 | 404 | 269 | 215 | 162 | 108 | 54 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 379.732 | 759.464 | 949.330 | 1.139.195 | 1.329.061 | 1.518.927 | 1.613.860 | 1.708.793 | 1.746.766 | 1.784.739 | 1.822.713 | 1.860.686 | 1.898.659 | 369.878 |
| C.V. ($/KPC) | 5.521 | 4.417 | 3.313 | 2.761 | 2.208 | 1.656 | 1.104 | 828 | 552 | 442 | 331 | 221 | 110 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.379.990 | 2.759.980 | 3.449.975 | 4.139.970 | 4.829.965 | 5.519.960 | 5.864.958 | 6.209.955 | 6.347.954 | 6.485.953 | 6.623.952 | 6.761.951 | 6.899.950 | 890.742 |
| C.V. ($/KPC) | 21.046 | 16.837 | 12.628 | 10.523 | 8.418 | 6.314 | 4.209 | 3.157 | 2.105 | 1.684 | 1.263 | 842 | 421 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.150 | 246.300 | 307.876 | 369.451 | 431.026 | 492.601 | 523.388 | 554.176 | 566.491 | 578.806 | 591.121 | 603.436 | 615.751 | 105.694 |
| C.V. ($/KPC) | 2.545 | 2.036 | 1.527 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 82.780 | 165.560 | 206.950 | 248.339 | 289.729 | 331.119 | 351.814 | 372.509 | 380.787 | 389.065 | 397.343 | 405.621 | 413.899 | 73.225 |
| C.V. ($/KPC) | 1.546 | 1.237 | 928 | 773 | 618 | 464 | 309 | 232 | 155 | 124 | 93 | 62 | 31 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.990 | 461.980 | 577.475 | 692.969 | 808.464 | 923.959 | 981.707 | 1.039.454 | 1.062.553 | 1.085.652 | 1.108.751 | 1.131.850 | 1.154.949 | 240.655 |
| C.V. ($/KPC) | 4.444 | 3.555 | 2.666 | 2.222 | 1.778 | 1.333 | 889 | 667 | 444 | 356 | 267 | 178 | 89 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 146.665 | 293.331 | 366.664 | 439.996 | 513.329 | 586.662 | 623.328 | 659.994 | 674.661 | 689.327 | 703.994 | 718.660 | 733.327 | 331.994 |
| C.V. ($/KPC) | 2.077 | 1.662 | 1.246 | 1.039 | 831 | 623 | 415 | 312 | 208 | 166 | 125 | 83 | 42 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 164.218 | 328.436 | 410.546 | 492.655 | 574.764 | 656.873 | 697.927 | 738.982 | 755.404 | 771.826 | 788.247 | 804.669 | 821.091 | 338.340 |
| C.V. ($/KPC) | 2.248 | 1.798 | 1.349 | 1.124 | 899 | 674 | 450 | 337 | 225 | 180 | 135 | 90 | 45 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 119.059 | 238.118 | 297.648 | 357.177 | 416.707 | 476.236 | 506.001 | 535.766 | 547.671 | 559.577 | 571.483 | 583.389 | 595.295 | 138.339 |
| C.V. ($/KPC) | 1.762 | 1.410 | 1.057 | 881 | 705 | 529 | 352 | 264 | 176 | 141 | 106 | 70 | 35 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.796 | 261.591 | 326.989 | 392.387 | 457.785 | 523.182 | 555.881 | 588.580 | 601.660 | 614.739 | 627.819 | 640.898 | 653.978 | 143.217 |
| C.V. ($/KPC) | 1.792 | 1.434 | 1.075 | 896 | 717 | 538 | 358 | 269 | 179 | 143 | 108 | 72 | 36 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 177.614 | 355.228 | 444.035 | 532.841 | 621.648 | 710.455 | 754.859 | 799.262 | 817.023 | 834.785 | 852.546 | 870.308 | 888.069 | 513.654 |
| C.V. ($/KPC) | 3.201 | 2.561 | 1.921 | 1.601 | 1.280 | 960 | 640 | 480 | 320 | 256 | 192 | 128 | 64 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 39.733 | 79.466 | 99.333 | 119.200 | 139.066 | 158.933 | 168.866 | 178.799 | 182.773 | 186.746 | 190.719 | 194.693 | 198.666 | 55.116 |
| C.V. ($/KPC) | 772 | 618 | 463 | 386 | 309 | 232 | 154 | 116 | 77 | 62 | 46 | 31 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
|||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 21.142 | 42.284 | 52.855 | 63.425 | 73.996 | 84.567 | 89.853 | 95.138 | 97.252 | 99.366 | 101.481 | 103.595 | 105.709 | 16.375 |
| C.V. ($/KPC) | 404 | 323 | 242 | 202 | 162 | 121 | 81 | 61 | 40 | 32 | 24 | 16 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 95.313 | 190.626 | 238.283 | 285.940 | 333.596 | 381.253 | 405.081 | 428.909 | 438.441 | 447.972 | 457.503 | 467.035 | 476.566 | 263.503 |
| C.V. ($/KPC) | 1.742 | 1.394 | 1.045 | 871 | 697 | 523 | 348 | 261 | 174 | 139 | 105 | 70 | 35 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.581.230 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS DE ENERO A MARZO DE 2025
CARGOS RESOLUCIÓN CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS DE ENERO A MARZO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP), reportados por el DANE en el mes de diciembre de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 244.117 | 488.233 | 610.292 | 732.350 | 854.408 | 976.466 | 1.037.496 | 1.098.525 | 1.122.936 | 1.147.348 | 1.171.760 | 1.196.171 | 1.220.583 | 834.228 |
| C.V. ($/KPC) | 5.135 | 4.108 | 3.081 | 2.568 | 2.054 | 1.541 | 1.027 | 770 | 514 | 411 | 308 | 205 | 103 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.404 | 224.808 | 281.011 | 337.213 | 393.415 | 449.617 | 477.718 | 505.819 | 517.059 | 528.300 | 539.540 | 550.781 | 562.021 | 200.900 |
| C.V. ($/KPC) | 3.444 | 2.755 | 2.066 | 1.722 | 1.378 | 1.033 | 689 | 517 | 344 | 276 | 207 | 138 | 69 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.894 | 91.788 | 114.736 | 137.683 | 160.630 | 183.577 | 195.050 | 206.524 | 211.113 | 215.703 | 220.292 | 224.882 | 229.471 | 57.828 |
| C.V. ($/KPC) | 1.902 | 1.522 | 1.141 | 951 | 761 | 571 | 380 | 285 | 190 | 152 | 114 | 76 | 38 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 109.219 | 218.437 | 273.047 | 327.656 | 382.265 | 436.874 | 464.179 | 491.484 | 502.406 | 513.327 | 524.249 | 535.171 | 546.093 | 150.499 |
| C.V. ($/KPC) | 2.249 | 1.799 | 1.349 | 1.125 | 900 | 675 | 450 | 337 | 225 | 180 | 135 | 90 | 45 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 137.139 | 274.279 | 342.849 | 411.418 | 479.988 | 548.558 | 582.842 | 617.127 | 630.841 | 644.555 | 658.269 | 671.983 | 685.697 | 515.976 |
| C.V. ($/KPC) | 3.016 | 2.413 | 1.810 | 1.508 | 1.206 | 905 | 603 | 452 | 302 | 241 | 181 | 121 | 60 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 48.431 | 96.862 | 121.078 | 145.294 | 169.509 | 193.725 | 205.833 | 217.940 | 222.784 | 227.627 | 232.470 | 237.313 | 242.156 | 177.151 |
| C.V. ($/KPC) | 1.123 | 898 | 674 | 562 | 449 | 337 | 225 | 168 | 112 | 90 | 67 | 45 | 22 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 111.722 | 223.444 | 279.305 | 335.165 | 391.026 | 446.887 | 474.818 | 502.748 | 513.920 | 525.092 | 536.265 | 547.437 | 558.609 | 397.079 |
| C.V. ($/KPC) | 2.692 | 2.154 | 1.615 | 1.346 | 1.077 | 808 | 538 | 404 | 269 | 215 | 162 | 108 | 54 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 379.752 | 759.504 | 949.381 | 1.139.257 | 1.329.133 | 1.519.009 | 1.613.947 | 1.708.885 | 1.746.860 | 1.784.835 | 1.822.811 | 1.860.786 | 1.898.761 | 369.878 |
| C.V. ($/KPC) | 5.521 | 4.417 | 3.313 | 2.761 | 2.208 | 1.656 | 1.104 | 828 | 552 | 442 | 331 | 221 | 110 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.380.065 | 2.760.130 | 3.450.162 | 4.140.194 | 4.830.227 | 5.520.259 | 5.865.275 | 6.210.292 | 6.348.298 | 6.486.305 | 6.624.311 | 6.762.318 | 6.900.324 | 890.742 |
| C.V. ($/KPC) | 21.047 | 16.838 | 12.628 | 10.524 | 8.419 | 6.314 | 4.209 | 3.157 | 2.105 | 1.684 | 1.263 | 842 | 421 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.157 | 246.314 | 307.892 | 369.470 | 431.049 | 492.627 | 523.416 | 554.206 | 566.521 | 578.837 | 591.153 | 603.468 | 615.784 | 105.694 |
| C.V. ($/KPC) | 2.545 | 2.036 | 1.527 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 82.784 | 165.568 | 206.961 | 248.353 | 289.745 | 331.137 | 351.833 | 372.529 | 380.807 | 389.086 | 397.364 | 405.643 | 413.921 | 73.225 |
| C.V. ($/KPC) | 1.546 | 1.237 | 928 | 773 | 618 | 464 | 309 | 232 | 155 | 124 | 93 | 62 | 31 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 231.002 | 462.004 | 577.506 | 693.007 | 808.508 | 924.009 | 981.759 | 1.039.510 | 1.062.610 | 1.085.710 | 1.108.811 | 1.131.911 | 1.155.011 | 240.655 |
| C.V. ($/KPC) | 4.444 | 3.555 | 2.666 | 2.222 | 1.778 | 1.333 | 889 | 667 | 444 | 356 | 267 | 178 | 89 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 146.673 | 293.347 | 366.684 | 440.020 | 513.357 | 586.694 | 623.362 | 660.030 | 674.698 | 689.365 | 704.032 | 718.700 | 733.367 | 331.994 |
| C.V. ($/KPC) | 2.077 | 1.662 | 1.246 | 1.039 | 831 | 623 | 415 | 312 | 208 | 166 | 125 | 83 | 42 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 164.227 | 328.454 | 410.568 | 492.682 | 574.795 | 656.909 | 697.966 | 739.022 | 755.445 | 771.868 | 788.291 | 804.713 | 821.136 | 338.340 |
| C.V. ($/KPC) | 2.249 | 1.799 | 1.349 | 1.125 | 900 | 675 | 450 | 337 | 225 | 180 | 135 | 90 | 45 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 119.065 | 238.131 | 297.664 | 357.196 | 416.729 | 476.262 | 506.028 | 535.794 | 547.701 | 559.607 | 571.514 | 583.420 | 595.327 | 138.339 |
| C.V. ($/KPC) | 1.762 | 1.410 | 1.057 | 881 | 705 | 529 | 352 | 264 | 176 | 141 | 106 | 70 | 35 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.803 | 261.606 | 327.007 | 392.408 | 457.810 | 523.211 | 555.912 | 588.613 | 601.693 | 614.773 | 627.853 | 640.934 | 654.014 | 143.217 |
| C.V. ($/KPC) | 1.792 | 1.434 | 1.075 | 896 | 717 | 538 | 358 | 269 | 179 | 143 | 108 | 72 | 36 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 177.623 | 355.247 | 444.059 | 532.870 | 621.682 | 710.494 | 754.899 | 799.305 | 817.068 | 834.830 | 852.592 | 870.355 | 888.117 | 513.654 |
| C.V. ($/KPC) | 3.201 | 2.561 | 1.921 | 1.601 | 1.280 | 960 | 640 | 480 | 320 | 256 | 192 | 128 | 64 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 39.735 | 79.470 | 99.338 | 119.206 | 139.073 | 158.941 | 168.875 | 178.808 | 182.782 | 186.755 | 190.729 | 194.702 | 198.676 | 55.116 |
| C.V. ($/KPC) | 772 | 618 | 463 | 386 | 309 | 232 | 154 | 116 | 77 | 62 | 46 | 31 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 21.143 | 42.286 | 52.858 | 63.429 | 74.001 | 84.572 | 89.858 | 95.144 | 97.258 | 99.372 | 101.486 | 103.601 | 105.715 | 16.375 |
| C.V. ($/KPC) | 404 | 323 | 242 | 202 | 162 | 121 | 81 | 61 | 40 | 32 | 24 | 16 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 95.318 | 190.637 | 238.296 | 285.955 | 333.614 | 381.274 | 405.103 | 428.933 | 438.465 | 447.996 | 457.528 | 467.060 | 476.592 | 263.503 |
| C.V. ($/KPC) | 1.742 | 1.394 | 1.045 | 871 | 697 | 523 | 348 | 261 | 174 | 139 | 105 | 70 | 35 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.581.230 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
APLICADOS EN FEBRERO DE 2025
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2024 – APLICADOS EN FEBRERO DE 2025
Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP), reportados por el DANE en el mes de diciembre de 2024; donde el IPP reportado por el DANE ha brindado una Cifra Provisional. Una vez se cuente con la Cifra Oficial se realizará la publicación de las tarifas, utilizando los indexadores definitivos publicados por el DANE (IPP).
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2023
APLICADOS EN ENERO DE 2025
CARGOS RESOLUCION CREG 102 010 DE 2022 A DIC DE 2024 – APLICADOS EN ENERO DE 2025* (ALCANCE)
*Estos Cargos se han calculado con base en en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP), reportados por el DANE en el mes de diciembre de 2024; donde el IPP reportado por el DANE ha brindado una Cifra Provisional. Una vez se cuente con la Cifra Oficial se realizará la publicación de las tarifas, utilizando los indexadores definitivos publicados por el DANE (IPP).
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.807 | 461.615 | 577.019 | 692.422 | 807.826 | 923.230 | 980.931 | 1.038.633 | 1.061.714 | 1.084.795 | 1.107.876 | 1.130.956 | 1.154.037 | 793.001 |
| C.V. ($/KPC) | 4.855 | 3.884 | 2.913 | 2.428 | 1.942 | 1.457 | 971 | 728 | 486 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.276 | 212.552 | 265.690 | 318.828 | 371.966 | 425.104 | 451.673 | 478.242 | 488.870 | 499.497 | 510.125 | 520.752 | 531.380 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.392 | 86.784 | 108.481 | 130.177 | 151.873 | 173.569 | 184.417 | 195.265 | 199.604 | 203.943 | 208.283 | 212.622 | 216.961 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.264 | 206.528 | 258.160 | 309.792 | 361.424 | 413.056 | 438.872 | 464.688 | 475.014 | 485.341 | 495.667 | 505.994 | 516.320 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.663 | 259.325 | 324.157 | 388.988 | 453.819 | 518.650 | 551.066 | 583.482 | 596.448 | 609.414 | 622.380 | 635.347 | 648.313 | 490.477 |
| C.V. ($/KPC) | 2.852 | 2.282 | 1.711 | 1.426 | 1.141 | 856 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.791 | 91.581 | 114.477 | 137.372 | 160.267 | 183.162 | 194.610 | 206.058 | 210.637 | 215.216 | 219.795 | 224.374 | 228.953 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.631 | 211.261 | 264.077 | 316.892 | 369.707 | 422.522 | 448.930 | 475.338 | 485.901 | 496.464 | 507.027 | 517.590 | 528.153 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 359.048 | 718.096 | 897.621 | 1.077.145 | 1.256.669 | 1.436.193 | 1.525.955 | 1.615.717 | 1.651.622 | 1.687.527 | 1.723.431 | 1.759.336 | 1.795.241 | 351.598 |
| C.V. ($/KPC) | 5.220 | 4.176 | 3.132 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.824 | 2.609.648 | 3.262.060 | 3.914.471 | 4.566.883 | 5.219.295 | 5.545.501 | 5.871.707 | 6.002.189 | 6.132.672 | 6.263.154 | 6.393.637 | 6.524.119 | 846.721 |
| C.V. ($/KPC) | 19.899 | 15.919 | 11.939 | 9.950 | 7.960 | 5.970 | 3.980 | 2.985 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.442 | 232.885 | 291.106 | 349.327 | 407.548 | 465.770 | 494.880 | 523.991 | 535.635 | 547.279 | 558.924 | 570.568 | 582.212 | 100.471 |
| C.V. ($/KPC) | 2.406 | 1.925 | 1.444 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.271 | 156.542 | 195.677 | 234.812 | 273.948 | 313.083 | 332.651 | 352.219 | 360.046 | 367.873 | 375.700 | 383.527 | 391.354 | 69.607 |
| C.V. ($/KPC) | 1.461 | 1.169 | 877 | 731 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.408 | 436.816 | 546.020 | 655.224 | 764.428 | 873.632 | 928.234 | 982.836 | 1.004.677 | 1.026.518 | 1.048.358 | 1.070.199 | 1.092.040 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.677 | 277.354 | 346.692 | 416.030 | 485.369 | 554.707 | 589.376 | 624.046 | 637.913 | 651.781 | 665.649 | 679.516 | 693.384 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.274 | 310.547 | 388.184 | 465.821 | 543.458 | 621.094 | 659.913 | 698.731 | 714.259 | 729.786 | 745.313 | 760.841 | 776.368 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.574 | 225.148 | 281.435 | 337.722 | 394.009 | 450.296 | 478.440 | 506.583 | 517.840 | 529.098 | 540.355 | 551.613 | 562.870 | 131.502 |
| C.V. ($/KPC) | 1.666 | 1.333 | 1.000 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.671 | 247.343 | 309.179 | 371.014 | 432.850 | 494.686 | 525.603 | 556.521 | 568.888 | 581.256 | 593.623 | 605.990 | 618.357 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.939 | 335.879 | 419.849 | 503.818 | 587.788 | 671.758 | 713.742 | 755.727 | 772.521 | 789.315 | 806.109 | 822.903 | 839.697 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.569 | 75.138 | 93.923 | 112.707 | 131.492 | 150.276 | 159.668 | 169.061 | 172.817 | 176.574 | 180.331 | 184.088 | 187.845 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.990 | 39.980 | 49.976 | 59.971 | 69.966 | 79.961 | 84.958 | 89.956 | 91.955 | 93.954 | 95.953 | 97.952 | 99.951 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.122 | 180.243 | 225.304 | 270.365 | 315.426 | 360.486 | 383.017 | 405.547 | 414.559 | 423.572 | 432.584 | 441.596 | 450.608 | 250.481 |
| C.V. ($/KPC) | 1.647 | 1.318 | 988 | 824 | 659 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN DICIEMBRE DE 2024
APLICABLE DEL 1 AL 31 DE DICIEMBRE DE 2024
Estos Cargos se han actualizado con base en el Indice de Precios al Consumidor (IPC) e Indice de Precios al Productor Oferta Interna (IPP), indices finales reportados por el DANE para el mes de diciembre de 2023.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.807 | 461.615 | 577.019 | 692.422 | 807.826 | 923.230 | 980.931 | 1.038.633 | 1.061.714 | 1.084.795 | 1.107.876 | 1.130.956 | 1.154.037 | 793.001 |
| C.V. ($/KPC) | 4.855 | 3.884 | 2.913 | 2.428 | 1.942 | 1.457 | 971 | 728 | 486 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.276 | 212.552 | 265.690 | 318.828 | 371.966 | 425.104 | 451.673 | 478.242 | 488.870 | 499.497 | 510.125 | 520.752 | 531.380 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.392 | 86.784 | 108.481 | 130.177 | 151.873 | 173.569 | 184.417 | 195.265 | 199.604 | 203.943 | 208.283 | 212.622 | 216.961 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.264 | 206.528 | 258.160 | 309.792 | 361.424 | 413.056 | 438.872 | 464.688 | 475.014 | 485.341 | 495.667 | 505.994 | 516.320 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.663 | 259.325 | 324.157 | 388.988 | 453.819 | 518.650 | 551.066 | 583.482 | 596.448 | 609.414 | 622.380 | 635.347 | 648.313 | 490.477 |
| C.V. ($/KPC) | 2.852 | 2.282 | 1.711 | 1.426 | 1.141 | 856 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.791 | 91.581 | 114.477 | 137.372 | 160.267 | 183.162 | 194.610 | 206.058 | 210.637 | 215.216 | 219.795 | 224.374 | 228.953 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.631 | 211.261 | 264.077 | 316.892 | 369.707 | 422.522 | 448.930 | 475.338 | 485.901 | 496.464 | 507.027 | 517.590 | 528.153 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 359.048 | 718.096 | 897.621 | 1.077.145 | 1.256.669 | 1.436.193 | 1.525.955 | 1.615.717 | 1.651.622 | 1.687.527 | 1.723.431 | 1.759.336 | 1.795.241 | 351.598 |
| C.V. ($/KPC) | 5.220 | 4.176 | 3.132 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.824 | 2.609.648 | 3.262.060 | 3.914.471 | 4.566.883 | 5.219.295 | 5.545.501 | 5.871.707 | 6.002.189 | 6.132.672 | 6.263.154 | 6.393.637 | 6.524.119 | 846.721 |
| C.V. ($/KPC) | 19.899 | 15.919 | 11.939 | 9.950 | 7.960 | 5.970 | 3.980 | 2.985 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.442 | 232.885 | 291.106 | 349.327 | 407.548 | 465.770 | 494.880 | 523.991 | 535.635 | 547.279 | 558.924 | 570.568 | 582.212 | 100.471 |
| C.V. ($/KPC) | 2.406 | 1.925 | 1.444 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.271 | 156.542 | 195.677 | 234.812 | 273.948 | 313.083 | 332.651 | 352.219 | 360.046 | 367.873 | 375.700 | 383.527 | 391.354 | 69.607 |
| C.V. ($/KPC) | 1.461 | 1.169 | 877 | 731 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.408 | 436.816 | 546.020 | 655.224 | 764.428 | 873.632 | 928.234 | 982.836 | 1.004.677 | 1.026.518 | 1.048.358 | 1.070.199 | 1.092.040 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.677 | 277.354 | 346.692 | 416.030 | 485.369 | 554.707 | 589.376 | 624.046 | 637.913 | 651.781 | 665.649 | 679.516 | 693.384 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.274 | 310.547 | 388.184 | 465.821 | 543.458 | 621.094 | 659.913 | 698.731 | 714.259 | 729.786 | 745.313 | 760.841 | 776.368 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.574 | 225.148 | 281.435 | 337.722 | 394.009 | 450.296 | 478.440 | 506.583 | 517.840 | 529.098 | 540.355 | 551.613 | 562.870 | 131.502 |
| C.V. ($/KPC) | 1.666 | 1.333 | 1.000 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.671 | 247.343 | 309.179 | 371.014 | 432.850 | 494.686 | 525.603 | 556.521 | 568.888 | 581.256 | 593.623 | 605.990 | 618.357 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.939 | 335.879 | 419.849 | 503.818 | 587.788 | 671.758 | 713.742 | 755.727 | 772.521 | 789.315 | 806.109 | 822.903 | 839.697 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.569 | 75.138 | 93.923 | 112.707 | 131.492 | 150.276 | 159.668 | 169.061 | 172.817 | 176.574 | 180.331 | 184.088 | 187.845 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.990 | 39.980 | 49.976 | 59.971 | 69.966 | 79.961 | 84.958 | 89.956 | 91.955 | 93.954 | 95.953 | 97.952 | 99.951 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.122 | 180.243 | 225.304 | 270.365 | 315.426 | 360.486 | 383.017 | 405.547 | 414.559 | 423.572 | 432.584 | 441.596 | 450.608 | 250.481 |
| C.V. ($/KPC) | 1.647 | 1.318 | 988 | 824 | 659 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN NOVIEMBRE DE 2024
APLICABLE DEL 1 AL 30 DE NOVIEMBRE DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales»
Cargos Resolución CREG 102 010 de 2022
APLICADOS EN OCTUBRE DE 2024
APLICABLE DEL 1 AL 31 DE OCTUBRE DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
|||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN SEPTIEMBRE DE 2024
APLICABLE DEL 1 AL 30 DE SEPTIEMBRE DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN AGOSTO DE 2024
APLICABLE DEL 1 AL 31 DE AGOSTO DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
APLICADOS EN JULIO DE 2024
APLICABLE DEL 1 AL 31 DE JULIO DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN JUNIO DE 2024
APLICABLE DEL 1 AL 30 DE JUNIO DE 2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN MAYO 2024
APLICADOS DE 1 AL 31 DE MAYO/2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN ABRIL DE 2024
APLICADOS DE 1 AL 30 DE ABRIL/2024
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
CARGOS RESOLUCION CREG 102 010 de 2022 A DIC DE 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.763 | 461.526 | 576.908 | 692.289 | 807.671 | 923.052 | 980.743 | 1.038.434 | 1.061.510 | 1.084.586 | 1.107.662 | 1.130.739 | 1.153.815 | 793.001 |
| C.V. ($/KPC) | 4.854 | 3.883 | 2.912 | 2.427 | 1.942 | 1.456 | 971 | 728 | 485 | 388 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.256 | 212.511 | 265.639 | 318.767 | 371.895 | 425.022 | 451.586 | 478.150 | 488.776 | 499.401 | 510.027 | 520.652 | 531.278 | 190.971 |
| C.V. ($/KPC) | 3.256 | 2.605 | 1.954 | 1.628 | 1.302 | 977 | 651 | 488 | 326 | 260 | 195 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.384 | 86.768 | 108.460 | 130.151 | 151.843 | 173.535 | 184.381 | 195.227 | 199.565 | 203.904 | 208.242 | 212.581 | 216.919 | 54.971 |
| C.V. ($/KPC) | 1.798 | 1.438 | 1.079 | 899 | 719 | 539 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.244 | 206.488 | 258.111 | 309.733 | 361.355 | 412.977 | 438.788 | 464.599 | 474.923 | 485.248 | 495.572 | 505.897 | 516.221 | 143.061 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.638 | 259.275 | 324.094 | 388.913 | 453.732 | 518.550 | 550.960 | 583.369 | 596.333 | 609.297 | 622.260 | 635.224 | 648.188 | 490.477 |
| C.V. ($/KPC) | 2.851 | 2.281 | 1.711 | 1.426 | 1.140 | 855 | 570 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.782 | 91.564 | 114.455 | 137.346 | 160.237 | 183.128 | 194.574 | 206.019 | 210.597 | 215.175 | 219.754 | 224.332 | 228.910 | 168.396 |
| C.V. ($/KPC) | 1.062 | 850 | 637 | 531 | 425 | 319 | 212 | 159 | 106 | 85 | 64 | 42 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.610 | 211.221 | 264.026 | 316.831 | 369.636 | 422.442 | 448.844 | 475.247 | 485.808 | 496.369 | 506.930 | 517.491 | 528.052 | 377.455 |
| C.V. ($/KPC) | 2.546 | 2.037 | 1.528 | 1.273 | 1.018 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 358.979 | 717.958 | 897.448 | 1.076.938 | 1.256.427 | 1.435.917 | 1.525.662 | 1.615.406 | 1.651.304 | 1.687.202 | 1.723.100 | 1.758.998 | 1.794.896 | 351.598 |
| C.V. ($/KPC) | 5.219 | 4.175 | 3.131 | 2.610 | 2.088 | 1.566 | 1.044 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.304.573 | 2.609.146 | 3.261.432 | 3.913.718 | 4.566.005 | 5.218.291 | 5.544.434 | 5.870.578 | 6.001.035 | 6.131.492 | 6.261.949 | 6.392.407 | 6.522.864 | 846.721 |
| C.V. ($/KPC) | 19.895 | 15.916 | 11.937 | 9.948 | 7.958 | 5.969 | 3.979 | 2.984 | 1.990 | 1.592 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.420 | 232.840 | 291.050 | 349.259 | 407.469 | 465.679 | 494.784 | 523.889 | 535.531 | 547.173 | 558.815 | 570.457 | 582.099 | 100.471 |
| C.V. ($/KPC) | 2.405 | 1.924 | 1.443 | 1.203 | 962 | 722 | 481 | 361 | 241 | 192 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.256 | 156.512 | 195.640 | 234.767 | 273.895 | 313.023 | 332.587 | 352.151 | 359.977 | 367.802 | 375.628 | 383.453 | 391.279 | 69.607 |
| C.V. ($/KPC) | 1.460 | 1.168 | 876 | 730 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.366 | 436.732 | 545.915 | 655.098 | 764.281 | 873.464 | 928.056 | 982.647 | 1.004.484 | 1.026.320 | 1.048.157 | 1.069.993 | 1.091.830 | 228.762 |
| C.V. ($/KPC) | 4.202 | 3.362 | 2.521 | 2.101 | 1.681 | 1.261 | 840 | 630 | 420 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.650 | 277.300 | 346.625 | 415.950 | 485.275 | 554.600 | 589.263 | 623.925 | 637.790 | 651.655 | 665.520 | 679.385 | 693.250 | 315.587 |
| C.V. ($/KPC) | 1.964 | 1.571 | 1.178 | 982 | 786 | 589 | 393 | 295 | 196 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.244 | 310.487 | 388.109 | 465.731 | 543.353 | 620.974 | 659.785 | 698.596 | 714.121 | 729.645 | 745.169 | 760.694 | 776.218 | 321.619 |
| C.V. ($/KPC) | 2.126 | 1.701 | 1.276 | 1.063 | 850 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.553 | 225.105 | 281.382 | 337.658 | 393.934 | 450.210 | 478.349 | 506.487 | 517.742 | 528.997 | 540.252 | 551.508 | 562.763 | 131.502 |
| C.V. ($/KPC) | 1.665 | 1.332 | 999 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.648 | 247.295 | 309.119 | 370.943 | 432.767 | 494.590 | 525.502 | 556.414 | 568.779 | 581.144 | 593.508 | 605.873 | 618.238 | 136.139 |
| C.V. ($/KPC) | 1.694 | 1.355 | 1.016 | 847 | 678 | 508 | 339 | 254 | 169 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 167.907 | 335.814 | 419.768 | 503.722 | 587.675 | 671.629 | 713.606 | 755.582 | 772.373 | 789.164 | 805.955 | 822.745 | 839.536 | 488.269 |
| C.V. ($/KPC) | 3.027 | 2.422 | 1.816 | 1.514 | 1.211 | 908 | 605 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.562 | 75.123 | 93.904 | 112.685 | 131.466 | 150.246 | 159.637 | 169.027 | 172.783 | 176.540 | 180.296 | 184.052 | 187.808 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.986 | 39.972 | 49.966 | 59.959 | 69.952 | 79.945 | 84.941 | 89.938 | 91.937 | 93.935 | 95.934 | 97.932 | 99.931 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.104 | 180.208 | 225.261 | 270.313 | 315.365 | 360.417 | 382.943 | 405.469 | 414.479 | 423.490 | 432.500 | 441.511 | 450.521 | 250.481 |
| C.V. ($/KPC) | 1.646 | 1.317 | 988 | 823 | 658 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN MARZO DE 2024
APLICADOS DE 1 AL 31 DE MARZO/2024
Estos Cargos se han calculado con base en el Indice de Precios al Consumidor (IPC) y Indice de Precios al Productor Oferta Interna (IPP), indices finales reportados por el DANE para el mes de diciembre de 2023. Dado, que las anteriores publicaciones de cargo para el mes de enero y febrero de 2024 se habían reportado con indexadores provisionales, los presentes cargos serán retroactivos desde el 1° de enero de 2024.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
CARGOS PROVISIONALES RESOLUCION CREG 102 010 de 2022 A DIC DE 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 230.922 | 461.844 | 577.305 | 692.765 | 808.226 | 923.687 | 981.418 | 1.039.148 | 1.062.240 | 1.085.332 | 1.108.425 | 1.131.517 | 1.154.609 | 793.001 |
| C.V. ($/KPC) | 4.857 | 3.886 | 2.914 | 2.429 | 1.943 | 1.457 | 971 | 729 | 486 | 389 | 291 | 194 | 97 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.329 | 212.658 | 265.822 | 318.986 | 372.151 | 425.315 | 451.897 | 478.480 | 489.112 | 499.745 | 510.378 | 521.011 | 531.644 | 190.971 |
| C.V. ($/KPC) | 3.259 | 2.607 | 1.955 | 1.630 | 1.304 | 978 | 652 | 489 | 326 | 261 | 196 | 130 | 65 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.414 | 86.827 | 108.534 | 130.241 | 151.948 | 173.654 | 184.508 | 195.361 | 199.703 | 204.044 | 208.385 | 212.727 | 217.068 | 54.971 |
| C.V. ($/KPC) | 1.800 | 1.440 | 1.080 | 900 | 720 | 540 | 360 | 270 | 180 | 144 | 108 | 72 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 103.315 | 206.630 | 258.288 | 309.946 | 361.603 | 413.261 | 439.090 | 464.918 | 475.250 | 485.581 | 495.913 | 506.244 | 516.576 | 143.061 |
| C.V. ($/KPC) | 2.127 | 1.702 | 1.276 | 1.064 | 851 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 129.727 | 259.454 | 324.317 | 389.180 | 454.044 | 518.907 | 551.339 | 583.771 | 596.743 | 609.716 | 622.689 | 635.661 | 648.634 | 490.477 |
| C.V. ($/KPC) | 2.853 | 2.282 | 1.712 | 1.427 | 1.141 | 856 | 571 | 428 | 285 | 228 | 171 | 114 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 45.813 | 91.627 | 114.534 | 137.440 | 160.347 | 183.254 | 194.707 | 206.160 | 210.742 | 215.323 | 219.904 | 224.486 | 229.067 | 168.396 |
| C.V. ($/KPC) | 1.063 | 850 | 638 | 532 | 425 | 319 | 213 | 159 | 106 | 85 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 105.683 | 211.366 | 264.208 | 317.049 | 369.891 | 422.732 | 449.153 | 475.574 | 486.142 | 496.710 | 507.278 | 517.847 | 528.415 | 377.455 |
| C.V. ($/KPC) | 2.547 | 2.038 | 1.528 | 1.274 | 1.019 | 764 | 509 | 382 | 255 | 204 | 153 | 102 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 359.226 | 718.452 | 898.066 | 1.077.679 | 1.257.292 | 1.436.905 | 1.526.711 | 1.616.518 | 1.652.441 | 1.688.363 | 1.724.286 | 1.760.208 | 1.796.131 | 351.598 |
| C.V. ($/KPC) | 5.223 | 4.178 | 3.134 | 2.612 | 2.089 | 1.567 | 1.045 | 783 | 522 | 418 | 313 | 209 | 104 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.305.470 | 2.610.940 | 3.263.675 | 3.916.410 | 4.569.145 | 5.221.880 | 5.548.248 | 5.874.615 | 6.005.162 | 6.135.709 | 6.266.256 | 6.396.803 | 6.527.350 | 846.721 |
| C.V. ($/KPC) | 19.908 | 15.926 | 11.945 | 9.954 | 7.963 | 5.972 | 3.982 | 2.986 | 1.991 | 1.593 | 1.194 | 796 | 398 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 116.500 | 233.000 | 291.250 | 349.500 | 407.750 | 466.000 | 495.125 | 524.250 | 535.900 | 547.550 | 559.200 | 570.850 | 582.500 | 100.471 |
| C.V. ($/KPC) | 2.407 | 1.926 | 1.444 | 1.204 | 963 | 722 | 481 | 361 | 241 | 193 | 144 | 96 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.310 | 156.619 | 195.774 | 234.929 | 274.084 | 313.238 | 332.816 | 352.393 | 360.224 | 368.055 | 375.886 | 383.717 | 391.548 | 69.607 |
| C.V. ($/KPC) | 1.461 | 1.169 | 877 | 731 | 584 | 438 | 292 | 219 | 146 | 117 | 88 | 58 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 218.516 | 437.032 | 546.291 | 655.549 | 764.807 | 874.065 | 928.694 | 983.323 | 1.005.175 | 1.027.026 | 1.048.878 | 1.070.729 | 1.092.581 | 228.762 |
| C.V. ($/KPC) | 4.205 | 3.364 | 2.523 | 2.103 | 1.682 | 1.262 | 841 | 631 | 421 | 336 | 252 | 168 | 84 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 138.745 | 277.491 | 346.864 | 416.236 | 485.609 | 554.982 | 589.668 | 624.354 | 638.229 | 652.103 | 665.978 | 679.852 | 693.727 | 315.587 |
| C.V. ($/KPC) | 1.965 | 1.572 | 1.179 | 983 | 786 | 590 | 393 | 295 | 197 | 157 | 118 | 79 | 39 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 155.350 | 310.700 | 388.376 | 466.051 | 543.726 | 621.401 | 660.238 | 699.076 | 714.611 | 730.146 | 745.681 | 761.216 | 776.751 | 321.619 |
| C.V. ($/KPC) | 2.127 | 1.702 | 1.276 | 1.064 | 851 | 638 | 425 | 319 | 213 | 170 | 128 | 85 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 112.630 | 225.260 | 281.575 | 337.890 | 394.205 | 450.520 | 478.678 | 506.835 | 518.098 | 529.361 | 540.624 | 551.887 | 563.150 | 131.502 |
| C.V. ($/KPC) | 1.666 | 1.333 | 1.000 | 833 | 666 | 500 | 333 | 250 | 167 | 133 | 100 | 67 | 33 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 123.733 | 247.465 | 309.332 | 371.198 | 433.064 | 494.930 | 525.864 | 556.797 | 569.170 | 581.543 | 593.916 | 606.290 | 618.663 | 136.139 |
| C.V. ($/KPC) | 1.696 | 1.357 | 1.018 | 848 | 678 | 509 | 339 | 254 | 170 | 136 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 168.023 | 336.046 | 420.057 | 504.068 | 588.080 | 672.091 | 714.097 | 756.103 | 772.905 | 789.707 | 806.509 | 823.312 | 840.114 | 488.269 |
| C.V. ($/KPC) | 3.029 | 2.423 | 1.817 | 1.515 | 1.212 | 909 | 606 | 454 | 303 | 242 | 182 | 121 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.587 | 75.175 | 93.969 | 112.762 | 131.556 | 150.350 | 159.746 | 169.143 | 172.902 | 176.661 | 180.420 | 184.178 | 187.937 | 52.392 |
| C.V. ($/KPC) | 730 | 584 | 438 | 365 | 292 | 219 | 146 | 110 | 73 | 58 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | |||||||||||||||
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.000 | 40.000 | 50.000 | 60.000 | 70.000 | 80.000 | 85.000 | 90.000 | 92.000 | 94.000 | 96.000 | 98.000 | 100.000 | 15.566 |
| C.V. ($/KPC) | 382 | 306 | 229 | 191 | 153 | 115 | 76 | 57 | 38 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.166 | 180.332 | 225.416 | 270.499 | 315.582 | 360.665 | 383.206 | 405.748 | 414.765 | 423.781 | 432.798 | 441.814 | 450.831 | 250.481 |
| C.V. ($/KPC) | 1.647 | 1.318 | 988 | 824 | 659 | 494 | 329 | 247 | 165 | 132 | 99 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.503.085 | ||||||||||||||
| C.V. ($/KPC) |
APLICADOS EN FEBRERO DE 2024
APLICABLE DEL 1 al 29 DE FEBRERO DE 2024
Estos Cargos se han calculado con base en los indices IPC e IPP del mes de diciembre de 2023, donde el Indice de Precios al Productor Oferta Interna (IPP), reportado por el DANE para el mes de diciembre de 2023, ha brindado una Cifra Provisional; una vez se cuente con la Cifra Oficial se realizará una nueva publicación de las tarifas, utilizando los indexadores definitivos publicados por el DANE (IPP).
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
CARGOS PROVISIONALES RESOLUCION CREG 102 010 de 2022 A DIC DE 2022 - APLICADOS EN ENERO 2024
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | |||||||||||||||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 al 31 DE ENERO DE 2024
Estos Cargos Provisionales se han calculado con base en los indices del mes de diciembre de 2022; toda vez que a la fecha no se cuenta con los indexadores de IPP e IPC que deben ser publicados por el DANE para diciembre de 2023. Una vez se cuente con estos índices se realizará una nueva publicación con las tarifas definitivas.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado en Diciembre 2023
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 AL 31 DE DICIEMBRE 2023
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado en Noviembre 2023
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
|||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | - |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 AL 30 DE NOVIEMBRE 2023
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado en Octubre 2023
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos |
|||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales |
|||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 AL 31 DE OCTUBRE DE 2023.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado a partir del 1 de septiembre 2023
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 AL 30 DE SEPTIEMBRE DE 2023.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado a partir del 1 de agosto 2023
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barrancabermeja | |||||||||||||||
| C.F. ($/KPCD-año) | - | 232.602 | 465.203 | 581.504 | 697.805 | 814.106 | 930.406 | 988.557 | 1.046.707 | 1.069.967 | 1.093.228 | 1.116.488 | 1.139.748 | 1.163.008 | 725.689 |
| C.V. ($/KPC) | 4.892 | 3.914 | 2.935 | 2.446 | 1.957 | 1.468 | 978 | 734 | 489 | 391 | 294 | 196 | 98 | - | |
| Barrancabermeja – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 107.102 | 214.204 | 267.756 | 321.307 | 374.858 | 428.409 | 455.184 | 481.960 | 492.670 | 503.380 | 514.091 | 524.801 | 535.511 | 174.761 |
| C.V. ($/KPC) | 3.282 | 2.626 | 1.969 | 1.641 | 1.313 | 985 | 656 | 492 | 328 | 263 | 197 | 131 | 66 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.730 | 87.459 | 109.324 | 131.189 | 153.054 | 174.918 | 185.851 | 196.783 | 201.156 | 205.529 | 209.902 | 214.275 | 218.648 | 50.305 |
| C.V. ($/KPC) | 1.813 | 1.450 | 1.088 | 907 | 725 | 544 | 363 | 272 | 181 | 145 | 109 | 73 | 36 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 104.067 | 208.134 | 260.167 | 312.200 | 364.234 | 416.267 | 442.284 | 468.301 | 478.707 | 489.114 | 499.521 | 509.927 | 520.334 | 130.918 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 130.671 | 261.341 | 326.677 | 392.012 | 457.347 | 522.682 | 555.350 | 588.018 | 601.085 | 614.152 | 627.219 | 640.286 | 653.353 | 448.844 |
| C.V. ($/KPC) | 2.873 | 2.298 | 1.724 | 1.437 | 1.149 | 862 | 575 | 431 | 287 | 230 | 172 | 115 | 57 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 46.147 | 92.294 | 115.367 | 138.440 | 161.514 | 184.587 | 196.124 | 207.661 | 212.275 | 216.890 | 221.505 | 226.119 | 230.734 | 154.103 |
| C.V. ($/KPC) | 1.070 | 856 | 642 | 535 | 428 | 321 | 214 | 161 | 107 | 86 | 64 | 43 | 21 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.452 | 212.904 | 266.130 | 319.355 | 372.581 | 425.807 | 452.420 | 479.033 | 489.678 | 500.323 | 510.969 | 521.614 | 532.259 | 345.416 |
| C.V. ($/KPC) | 2.566 | 2.053 | 1.540 | 1.283 | 1.026 | 770 | 513 | 385 | 257 | 205 | 154 | 103 | 51 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 361.839 | 723.679 | 904.599 | 1.085.518 | 1.266.438 | 1.447.358 | 1.537.817 | 1.628.277 | 1.664.461 | 1.700.645 | 1.736.829 | 1.773.013 | 1.809.197 | 321.754 |
| C.V. ($/KPC) | 5.261 | 4.209 | 3.157 | 2.631 | 2.104 | 1.578 | 1.052 | 789 | 526 | 421 | 316 | 210 | 105 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.314.967 | 2.629.934 | 3.287.417 | 3.944.900 | 4.602.384 | 5.259.867 | 5.588.609 | 5.917.351 | 6.048.847 | 6.180.344 | 6.311.841 | 6.443.337 | 6.574.834 | 774.850 |
| C.V. ($/KPC) | 20.053 | 16.042 | 12.032 | 10.027 | 8.021 | 6.016 | 4.011 | 3.008 | 2.005 | 1.604 | 1.203 | 802 | 401 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.347 | 234.695 | 293.369 | 352.042 | 410.716 | 469.390 | 498.726 | 528.063 | 539.798 | 551.533 | 563.268 | 575.002 | 586.737 | 91.943 |
| C.V. ($/KPC) | 2.424 | 1.939 | 1.454 | 1.212 | 970 | 727 | 485 | 364 | 242 | 194 | 145 | 97 | 48 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 78.879 | 157.758 | 197.198 | 236.638 | 276.077 | 315.517 | 335.237 | 354.956 | 362.844 | 370.732 | 378.620 | 386.508 | 394.396 | 63.698 |
| C.V. ($/KPC) | 1.472 | 1.178 | 883 | 736 | 589 | 442 | 294 | 221 | 147 | 118 | 88 | 59 | 29 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 220.106 | 440.212 | 550.265 | 660.317 | 770.370 | 880.423 | 935.450 | 990.476 | 1.012.487 | 1.034.497 | 1.056.508 | 1.078.518 | 1.100.529 | 209.344 |
| C.V. ($/KPC) | 4.236 | 3.389 | 2.542 | 2.118 | 1.694 | 1.271 | 847 | 635 | 424 | 339 | 254 | 169 | 85 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 139.755 | 279.509 | 349.387 | 419.264 | 489.141 | 559.018 | 593.957 | 628.896 | 642.871 | 656.847 | 670.822 | 684.798 | 698.773 | 288.799 |
| C.V. ($/KPC) | 1.980 | 1.584 | 1.188 | 990 | 792 | 594 | 396 | 297 | 198 | 158 | 119 | 79 | 40 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 156.480 | 312.961 | 391.201 | 469.441 | 547.681 | 625.922 | 665.042 | 704.162 | 719.810 | 735.458 | 751.106 | 766.754 | 782.402 | 294.319 |
| C.V. ($/KPC) | 2.143 | 1.714 | 1.286 | 1.072 | 857 | 643 | 429 | 321 | 214 | 171 | 129 | 86 | 43 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 113.449 | 226.898 | 283.623 | 340.348 | 397.072 | 453.797 | 482.159 | 510.521 | 521.866 | 533.211 | 544.556 | 555.901 | 567.246 | 120.340 |
| C.V. ($/KPC) | 1.678 | 1.342 | 1.007 | 839 | 671 | 503 | 336 | 252 | 168 | 134 | 101 | 67 | 34 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 124.633 | 249.265 | 311.582 | 373.898 | 436.214 | 498.530 | 529.689 | 560.847 | 573.310 | 585.773 | 598.236 | 610.700 | 623.163 | 124.583 |
| C.V. ($/KPC) | 1.708 | 1.366 | 1.025 | 854 | 683 | 512 | 342 | 256 | 171 | 137 | 102 | 68 | 34 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 169.245 | 338.490 | 423.113 | 507.735 | 592.358 | 676.980 | 719.291 | 761.603 | 778.527 | 795.452 | 812.376 | 829.301 | 846.225 | 446.823 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 37.861 | 75.722 | 94.652 | 113.582 | 132.513 | 151.443 | 160.908 | 170.374 | 174.160 | 177.946 | 181.732 | 185.518 | 189.304 | 47.945 |
| C.V. ($/KPC) | 735 | 588 | 441 | 368 | 294 | 221 | 147 | 110 | 74 | 59 | 44 | 29 | 15 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 20.145 | 40.291 | 50.364 | 60.436 | 70.509 | 80.582 | 85.618 | 90.654 | 92.669 | 94.683 | 96.698 | 98.712 | 100.727 | 14.244 |
| C.V. ($/KPC) | 385 | 308 | 231 | 193 | 154 | 116 | 77 | 58 | 39 | 31 | 23 | 15 | 8 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 90.822 | 181.644 | 227.055 | 272.466 | 317.877 | 363.288 | 385.994 | 408.699 | 417.781 | 426.863 | 435.946 | 445.028 | 454.110 | 229.219 |
| C.V. ($/KPC) | 1.659 | 1.327 | 995 | 830 | 664 | 498 | 332 | 249 | 166 | 133 | 100 | 66 | 33 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1.375.500 |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 DE AGOSTO a 31 DE AGOSTO DE 2023.
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales«.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado a partir del 1° de julio 2023
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 DE JULIO a 31 DE JULIO DE 2023.
Nota:
1.Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
2. Las tarifas registradas en el tramo Apiay – Usme aplicarán a partir del 30 de junio de 2023 dada la declaratoria de retiro del servicio de la Compresora Apiay.
Cargos Resolución CREG 102 010 de 2022 a DIC de 2022 Aplicado a partir del 1° de junio 2023
| % de la Inversión Base Remunerada con Cargo Fijo | 0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. ($/KPCD-año) | - | 217.933 | 435.866 | 544.833 | 653.799 | 762.766 | 871.732 | 926.215 | 980.699 | 1.002.492 | 1.024.285 | 1.046.078 | 1.067.872 | 1.089.665 | 726.646 |
| C.V. ($/KPC) | 4.561 | 3.649 | 2.737 | 2.281 | 1.824 | 1.368 | 912 | 684 | 456 | 365 | 274 | 182 | 91 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. ($/KPCD-año) | - | 101.415 | 202.830 | 253.538 | 304.245 | 354.953 | 405.660 | 431.014 | 456.368 | 466.509 | 476.651 | 486.792 | 496.934 | 507.075 | 175.875 |
| C.V. ($/KPC) | 3.083 | 2.466 | 1.850 | 1.542 | 1.233 | 925 | 617 | 462 | 308 | 247 | 185 | 123 | 62 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 41.356 | 82.712 | 103.391 | 124.069 | 144.747 | 165.425 | 175.764 | 186.103 | 190.239 | 194.374 | 198.510 | 202.645 | 206.781 | 50.464 |
| C.V. ($/KPC) | 1.703 | 1.362 | 1.022 | 852 | 681 | 511 | 341 | 255 | 170 | 136 | 102 | 68 | 34 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. ($/KPCD-año) | - | 98.382 | 196.764 | 245.955 | 295.145 | 344.336 | 393.527 | 418.123 | 442.718 | 452.556 | 462.394 | 472.233 | 482.071 | 491.909 | 131.266 |
| C.V. ($/KPC) | 2.014 | 1.611 | 1.208 | 1.007 | 806 | 604 | 403 | 302 | 201 | 161 | 121 | 81 | 40 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. ($/KPCD-año) | - | 122.668 | 245.336 | 306.670 | 368.003 | 429.337 | 490.671 | 521.338 | 552.005 | 564.272 | 576.539 | 588.805 | 601.072 | 613.339 | 451.642 |
| C.V. ($/KPC) | 2.679 | 2.143 | 1.607 | 1.340 | 1.072 | 804 | 536 | 402 | 268 | 214 | 161 | 107 | 54 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. ($/KPCD-año) | - | 43.372 | 86.745 | 108.431 | 130.117 | 151.803 | 173.490 | 184.333 | 195.176 | 199.513 | 203.850 | 208.188 | 212.525 | 216.862 | 155.382 |
| C.V. ($/KPC) | 996 | 797 | 598 | 498 | 398 | 299 | 199 | 149 | 100 | 80 | 60 | 40 | 20 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. ($/KPCD-año) | - | 100.170 | 200.340 | 250.426 | 300.511 | 350.596 | 400.681 | 425.723 | 450.766 | 460.783 | 470.800 | 480.817 | 490.834 | 500.851 | 349.117 |
| C.V. ($/KPC) | 2.387 | 1.910 | 1.432 | 1.194 | 955 | 716 | 477 | 358 | 239 | 191 | 143 | 95 | 48 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. ($/KPCD-año) | - | 340.973 | 681.947 | 852.434 | 1.022.920 | 1.193.407 | 1.363.894 | 1.449.137 | 1.534.380 | 1.568.478 | 1.602.575 | 1.636.672 | 1.670.770 | 1.704.867 | 321.522 |
| C.V. ($/KPC) | 4.954 | 3.963 | 2.972 | 2.477 | 1.982 | 1.486 | 991 | 743 | 495 | 396 | 297 | 198 | 99 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. ($/KPCD-año) | - | 1.246.984 | 2.493.968 | 3.117.461 | 3.740.953 | 4.364.445 | 4.987.937 | 5.299.683 | 5.611.429 | 5.736.127 | 5.860.826 | 5.985.524 | 6.110.223 | 6.234.921 | 779.686 |
| C.V. ($/KPC) | 18.956 | 15.165 | 11.374 | 9.478 | 7.582 | 5.687 | 3.791 | 2.843 | 1.896 | 1.516 | 1.137 | 758 | 379 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 110.573 | 221.147 | 276.434 | 331.720 | 387.007 | 442.294 | 469.937 | 497.580 | 508.638 | 519.695 | 530.752 | 541.810 | 552.867 | 91.820 |
| C.V. ($/KPC) | 2.281 | 1.825 | 1.369 | 1.141 | 912 | 684 | 456 | 342 | 228 | 182 | 137 | 91 | 46 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. ($/KPCD-año) | - | 73.964 | 147.929 | 184.911 | 221.893 | 258.875 | 295.858 | 314.349 | 332.840 | 340.236 | 347.633 | 355.029 | 362.426 | 369.822 | 63.349 |
| C.V. ($/KPC) | 1.378 | 1.102 | 827 | 689 | 551 | 413 | 276 | 207 | 138 | 110 | 83 | 55 | 28 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. ($/KPCD-año) | - | 207.353 | 414.705 | 518.382 | 622.058 | 725.734 | 829.410 | 881.249 | 933.087 | 953.822 | 974.557 | 995.292 | 1.016.028 | 1.036.763 | 209.410 |
| C.V. ($/KPC) | 3.981 | 3.185 | 2.389 | 1.991 | 1.592 | 1.194 | 796 | 597 | 398 | 318 | 239 | 159 | 80 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. ($/KPCD-año) | - | 131.552 | 263.104 | 328.880 | 394.655 | 460.431 | 526.207 | 559.095 | 591.983 | 605.138 | 618.293 | 631.449 | 644.604 | 657.759 | 288.215 |
| C.V. ($/KPC) | 1.863 | 1.490 | 1.118 | 932 | 745 | 559 | 373 | 279 | 186 | 149 | 112 | 75 | 37 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. ($/KPCD-año) | - | 222.843 | 445.686 | 557.107 | 668.528 | 779.950 | 891.371 | 947.082 | 1.002.793 | 1.025.077 | 1.047.361 | 1.069.645 | 1.091.930 | 1.114.214 | 407.731 |
| C.V. ($/KPC) | 3.051 | 2.441 | 1.831 | 1.526 | 1.220 | 915 | 610 | 458 | 305 | 244 | 183 | 122 | 61 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. ($/KPCD-año) | - | 106.807 | 213.614 | 267.018 | 320.422 | 373.825 | 427.229 | 453.931 | 480.632 | 491.313 | 501.994 | 512.675 | 523.355 | 534.036 | 119.876 |
| C.V. ($/KPC) | 1.579 | 1.263 | 947 | 790 | 632 | 474 | 316 | 237 | 158 | 126 | 95 | 63 | 32 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. ($/KPCD-año) | - | 117.326 | 234.652 | 293.315 | 351.978 | 410.641 | 469.304 | 498.636 | 527.967 | 539.700 | 551.432 | 563.165 | 574.897 | 586.630 | 124.220 |
| C.V. ($/KPC) | 1.607 | 1.286 | 964 | 804 | 643 | 482 | 321 | 241 | 161 | 129 | 96 | 64 | 32 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. ($/KPCD-año) | - | 158.219 | 316.439 | 395.549 | 474.658 | 553.768 | 632.878 | 672.432 | 711.987 | 727.809 | 743.631 | 759.453 | 775.275 | 791.097 | 447.953 |
| C.V. ($/KPC) | 2.825 | 2.260 | 1.695 | 1.413 | 1.130 | 848 | 565 | 424 | 283 | 226 | 170 | 113 | 57 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. ($/KPCD-año) | - | 35.498 | 70.996 | 88.745 | 106.494 | 124.243 | 141.992 | 150.867 | 159.741 | 163.291 | 166.841 | 170.390 | 173.940 | 177.490 | 47.861 |
| C.V. ($/KPC) | 688 | 550 | 413 | 344 | 275 | 206 | 138 | 103 | 69 | 55 | 41 | 28 | 14 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. ($/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. ($/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. ($/KPCD-año) | - | 19.028 | 38.057 | 47.571 | 57.085 | 66.599 | 76.114 | 80.871 | 85.628 | 87.531 | 89.433 | 91.336 | 93.239 | 95.142 | 14.211 |
| C.V. ($/KPC) | 363 | 290 | 218 | 182 | 145 | 109 | 73 | 54 | 36 | 29 | 22 | 15 | 7 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. ($/KPCD-año) | - | 85.695 | 171.390 | 214.238 | 257.086 | 299.933 | 342.781 | 364.205 | 385.628 | 394.198 | 402.767 | 411.337 | 419.906 | 428.476 | 228.584 |
| C.V. ($/KPC) | 1.564 | 1.251 | 938 | 782 | 626 | 469 | 313 | 235 | 156 | 125 | 94 | 63 | 31 | - | |
| Gasoducto del Ariari | |||||||||||||||
| C.F. ($/KPCD-año) | 1.373.562 | ||||||||||||||
| C.V. ($/KPC) |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1 DE JUNIO a 30 DE JUNIO DE 2023
Nota: Teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos para servicio de transporte en firme resolución CREG 003/2018 y CREG 106/2018 Con PPI e IPC Oficial a Dic de 2022 Aplicado 15 de Mayo a 31 de Diciembre de 2023
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% |
CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 63.062 | 126.125 | 157.655 | 189.186 | 220.718 | 252.248 | 268.015 | 283.780 | 290.085 | 296.392 | 302.698 | 309.004 | 315.311 | 722,564 |
| C.V. (US$/KPC) | 1.583 | 1.266 | 0.950 | 0.791 | 0.633 | 0.475 | 0.317 | 0.238 | 0.158 | 0.126 | 0.096 | 0.064 | 0.032 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 17.776 | 35.552 | 44.439 | 53.326 | 62.215 | 71.102 | 75.546 | 79.991 | 81.768 | 83.545 | 85.324 | 87.101 | 88.878 | 171,210 |
| C.V. (US$/KPC) | 0.645 | 0.516 | 0.388 | 0.323 | 0.257 | 0.194 | 0.129 | 0.097 | 0.065 | 0.052 | 0.038 | 0.025 | 0.013 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 7.340 | 14.681 | 18.351 | 22.020 | 25.690 | 29.360 | 31.196 | 33.030 | 33.764 | 34.498 | 35.232 | 35.966 | 36.700 | 49,789 |
| C.V. (US$/KPC) | 0.360 | 0.288 | 0.215 | 0.179 | 0.143 | 0.108 | 0.072 | 0.054 | 0.036 | 0.029 | 0.021 | 0.015 | 0.007 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 17.030 | 34.061 | 42.577 | 51.091 | 59.607 | 68.122 | 72.380 | 76.638 | 78.341 | 80.044 | 81.747 | 83.450 | 85.152 | 129,818 |
| C.V. (US$/KPC) | 0.411 | 0.329 | 0.247 | 0.206 | 0.165 | 0.123 | 0.082 | 0.062 | 0.041 | 0.033 | 0.025 | 0.016 | 0.008 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 36.039 | 72.079 | 90.098 | 108.118 | 126.138 | 144.157 | 153.166 | 162.177 | 165.780 | 169.384 | 172.989 | 176.592 | 180.196 | 440,381 |
| C.V. (US$/KPC) | 0.946 | 0.757 | 0.568 | 0.473 | 0.378 | 0.284 | 0.190 | 0.142 | 0.094 | 0.076 | 0.057 | 0.038 | 0.019 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 12.665 | 25.329 | 31.662 | 37.994 | 44.326 | 50.659 | 53.824 | 56.991 | 58.257 | 59.523 | 60.789 | 62.056 | 63.323 | 150,323 |
| C.V. (US$/KPC) | 0.353 | 0.283 | 0.211 | 0.177 | 0.141 | 0.106 | 0.070 | 0.053 | 0.036 | 0.028 | 0.021 | 0.015 | 0.007 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 29.108 | 58.217 | 72.771 | 87.325 | 101.880 | 116.433 | 123.710 | 130.988 | 133.898 | 136.809 | 139.721 | 142.632 | 145.542 | 334,590 |
| C.V. (US$/KPC) | 0.849 | 0.680 | 0.510 | 0.425 | 0.340 | 0.255 | 0.170 | 0.127 | 0.085 | 0.068 | 0.050 | 0.035 | 0.017 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 61.399 | 122.796 | 153.495 | 184.195 | 214.894 | 245.592 | 260.942 | 276.291 | 282.431 | 288.571 | 294.711 | 300.851 | 306.991 | 322,444 |
| C.V. (US$/KPC) | 1.027 | 0.822 | 0.616 | 0.514 | 0.410 | 0.308 | 0.206 | 0.154 | 0.102 | 0.082 | 0.061 | 0.041 | 0.020 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 113.931 | 227.864 | 284.829 | 341.795 | 398.761 | 455.726 | 484.209 | 512.692 | 524.085 | 535.478 | 546.873 | 558.266 | 569.659 | 759,329 |
| C.V. (US$/KPC) | 1.998 | 1.598 | 1.199 | 0.999 | 0.799 | 0.600 | 0.400 | 0.300 | 0.200 | 0.159 | 0.119 | 0.080 | 0.040 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 27.647 | 55.292 | 69.115 | 82.939 | 96.761 | 110.584 | 117.496 | 124.407 | 127.172 | 129.937 | 132.701 | 135.466 | 138.231 | 92,359 |
| C.V. (US$/KPC) | 0.660 | 0.527 | 0.396 | 0.329 | 0.264 | 0.198 | 0.131 | 0.100 | 0.066 | 0.053 | 0.040 | 0.027 | 0.013 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14.742 | 29.484 | 36.854 | 44.224 | 51.596 | 58.966 | 62.652 | 66.337 | 67.811 | 69.285 | 70.760 | 72.233 | 73.708 | 64,856 |
| C.V. (US$/KPC) | 0.324 | 0.259 | 0.194 | 0.162 | 0.129 | 0.097 | 0.065 | 0.049 | 0.032 | 0.025 | 0.020 | 0.013 | 0.007 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 40.838 | 81.675 | 102.095 | 122.513 | 142.933 | 163.351 | 173.561 | 183.770 | 187.854 | 191.938 | 196.022 | 200.106 | 204.190 | 209,104 |
| C.V. (US$/KPC) | 0.910 | 0.729 | 0.546 | 0.455 | 0.364 | 0.273 | 0.182 | 0.137 | 0.092 | 0.073 | 0.054 | 0.036 | 0.019 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 38.392 | 76.784 | 95.979 | 115.175 | 134.371 | 153.567 | 163.166 | 172.763 | 176.603 | 180.441 | 184.281 | 188.119 | 191.959 | 290,664 |
| C.V. (US$/KPC) | 0.628 | 0.502 | 0.377 | 0.313 | 0.251 | 0.188 | 0.126 | 0.094 | 0.062 | 0.050 | 0.037 | 0.025 | 0.012 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 56.533 | 113.065 | 141.331 | 169.597 | 197.864 | 226.130 | 240.263 | 254.397 | 260.050 | 265.702 | 271.357 | 277.009 | 282.663 | 409,785 |
| C.V. (US$/KPC) | 0.891 | 0.713 | 0.535 | 0.446 | 0.356 | 0.267 | 0.178 | 0.134 | 0.089 | 0.072 | 0.053 | 0.036 | 0.017 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 31.149 | 62.297 | 77.872 | 93.446 | 109.020 | 124.596 | 132.383 | 140.170 | 143.285 | 146.400 | 149.515 | 152.630 | 155.744 | 121,815 |
| C.V. (US$/KPC) | 0.534 | 0.426 | 0.320 | 0.267 | 0.214 | 0.161 | 0.106 | 0.080 | 0.053 | 0.042 | 0.032 | 0.021 | 0.011 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 34.230 | 68.458 | 85.573 | 102.688 | 119.803 | 136.918 | 145.475 | 154.033 | 157.456 | 160.879 | 164.302 | 167.725 | 171.148 | 125,740 |
| C.V. (US$/KPC) | 0.540 | 0.431 | 0.324 | 0.269 | 0.216 | 0.162 | 0.108 | 0.081 | 0.054 | 0.044 | 0.032 | 0.021 | 0.011 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 47.192 | 94.383 | 117.979 | 141.575 | 165.170 | 188.766 | 200.564 | 212.362 | 217.081 | 221.800 | 226.519 | 231.239 | 235.957 | 443,486 |
| C.V. (US$/KPC) | 1.038 | 0.830 | 0.622 | 0.519 | 0.415 | 0.312 | 0.207 | 0.155 | 0.104 | 0.084 | 0.062 | 0.041 | 0.021 | - | |
| Cargos Estampilla Ramales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.884 | 13.770 | 17.212 | 20.655 | 24.098 | 27.539 | 29.262 | 30.982 | 31.670 | 32.358 | 33.047 | 33.736 | 34.425 | 48,168 |
| C.V. (US$/KPC) | 0.158 | 0.126 | 0.094 | 0.078 | 0.064 | 0.048 | 0.032 | 0.024 | 0.016 | 0.013 | 0.009 | 0.007 | 0.003 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5.474 | 10.947 | 13.684 | 16.419 | 19.156 | 21.893 | 23.261 | 24.630 | 25.178 | 25.725 | 26.272 | 26.820 | 27.367 | 14,352 |
| C.V. (US$/KPC) | 0.121 | 0.097 | 0.073 | 0.060 | 0.048 | 0.036 | 0.024 | 0.019 | 0.012 | 0.009 | 0.007 | 0.005 | 0.003 | - | - |
| SABANA Tarifa plena SIN delta cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 24.772 | 49.542 | 61.928 | 74.314 | 86.700 | 99.086 | 105.279 | 111.472 | 113.949 | 116.425 | 118.903 | 121.380 | 123.858 | 231,327 |
| C.V. (US$/KPC) | 0.520 | 0.417 | 0.312 | 0.260 | 0.208 | 0.157 | 0.104 | 0.078 | 0.052 | 0.041 | 0.032 | 0.021 | 0.011 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,381,696 |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
ACTUALIZADOS A MAYO DE 2023
APLICABLE DEL 15 DE MAYO A 31 DE DICIEMBRE DE 2023
Nota: En cumplimiento con lo estipulado en el Artículo 15 de la Resolución CREG 126 de 2010 y teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales». Igualmente, se realiza ajuste tarifario por retiro del servicio del tramo Montañuelo – Gualanday, los ramales Galán – Termobarranca y San Luis.
Cargos para servicio de transporte en firme resolución CREG 003/2018 y CREG 106/2018 Con PPI e IPC Oficial a Dic de 2022 Aplicado del 1° de enero a 14 de mayo de 2023
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% |
CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 63.062 | 126.125 | 157.655 | 189.186 | 220.718 | 252.248 | 268.015 | 283.780 | 290.085 | 296.392 | 302.698 | 309.004 | 315.311 | 722,564 |
| C.V. (US$/KPC) | 1.583 | 1.266 | 0.950 | 0.791 | 0.633 | 0.475 | 0.317 | 0.238 | 0.158 | 0.126 | 0.096 | 0.064 | 0.032 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 17.776 | 35.552 | 44.439 | 53.326 | 62.215 | 71.102 | 75.546 | 79.991 | 81.768 | 83.545 | 85.324 | 87.101 | 88.878 | 171,210 |
| C.V. (US$/KPC) | 0.645 | 0.516 | 0.388 | 0.323 | 0.257 | 0.194 | 0.129 | 0.097 | 0.065 | 0.052 | 0.038 | 0.025 | 0.013 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 7.340 | 14.681 | 18.351 | 22.020 | 25.690 | 29.360 | 31.196 | 33.030 | 33.764 | 34.498 | 35.232 | 35.966 | 36.700 | 49,789 |
| C.V. (US$/KPC) | 0.360 | 0.288 | 0.215 | 0.179 | 0.143 | 0.108 | 0.072 | 0.054 | 0.036 | 0.029 | 0.021 | 0.015 | 0.007 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 17.030 | 34.061 | 42.577 | 51.091 | 59.607 | 68.122 | 72.380 | 76.638 | 78.341 | 80.044 | 81.747 | 83.450 | 85.152 | 129,818 |
| C.V. (US$/KPC) | 0.411 | 0.329 | 0.247 | 0.206 | 0.165 | 0.123 | 0.082 | 0.062 | 0.041 | 0.033 | 0.025 | 0.016 | 0.008 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 36.039 | 72.079 | 90.098 | 108.118 | 126.138 | 144.157 | 153.166 | 162.177 | 165.780 | 169.384 | 172.989 | 176.592 | 180.196 | 440,381 |
| C.V. (US$/KPC) | 0.946 | 0.757 | 0.568 | 0.473 | 0.378 | 0.284 | 0.190 | 0.142 | 0.094 | 0.076 | 0.057 | 0.038 | 0.019 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 12.665 | 25.329 | 31.662 | 37.994 | 44.326 | 50.659 | 53.824 | 56.991 | 58.257 | 59.523 | 60.789 | 62.056 | 63.323 | 150,323 |
| C.V. (US$/KPC) | 0.353 | 0.283 | 0.211 | 0.177 | 0.141 | 0.106 | 0.070 | 0.053 | 0.036 | 0.028 | 0.021 | 0.015 | 0.007 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 29.108 | 58.217 | 72.771 | 87.325 | 101.880 | 116.433 | 123.710 | 130.988 | 133.898 | 136.809 | 139.721 | 142.632 | 145.542 | 334,590 |
| C.V. (US$/KPC) | 0.849 | 0.680 | 0.510 | 0.425 | 0.340 | 0.255 | 0.170 | 0.127 | 0.085 | 0.068 | 0.050 | 0.035 | 0.017 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 61.399 | 122.796 | 153.495 | 184.195 | 214.894 | 245.592 | 260.942 | 276.291 | 282.431 | 288.571 | 294.711 | 300.851 | 306.991 | 322,444 |
| C.V. (US$/KPC) | 1.027 | 0.822 | 0.616 | 0.514 | 0.410 | 0.308 | 0.206 | 0.154 | 0.102 | 0.082 | 0.061 | 0.041 | 0.020 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 113.931 | 227.864 | 284.829 | 341.795 | 398.761 | 455.726 | 484.209 | 512.692 | 524.085 | 535.478 | 546.873 | 558.266 | 569.659 | 759,329 |
| C.V. (US$/KPC) | 1.998 | 1.598 | 1.199 | 0.999 | 0.799 | 0.600 | 0.400 | 0.300 | 0.200 | 0.159 | 0.119 | 0.080 | 0.040 | - | |
| Montañuelo - Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 2,281.493 | 4,562.985 | 5,703.731 | 6,844.478 | 7,985.224 | 9,125.970 | 9,696.343 | 10,266.717 | 10,494.867 | 10,723.016 | 10,951.165 | 11,179.314 | 11,407.463 | 19,633,985 |
| C.V. (US$/KPC) | 36.003 | 28.803 | 21.601 | 18.002 | 14.401 | 10.801 | 7.200 | 5.401 | 3.601 | 2.880 | 2.161 | 1.440 | 0.721 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 27.647 | 55.292 | 69.115 | 82.939 | 96.761 | 110.584 | 117.496 | 124.407 | 127.172 | 129.937 | 132.701 | 135.466 | 138.231 | 92,359 |
| C.V. (US$/KPC) | 0.660 | 0.527 | 0.396 | 0.329 | 0.264 | 0.198 | 0.131 | 0.100 | 0.066 | 0.053 | 0.040 | 0.027 | 0.013 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14.742 | 29.484 | 36.854 | 44.224 | 51.596 | 58.966 | 62.652 | 66.337 | 67.811 | 69.285 | 70.760 | 72.233 | 73.708 | 64,856 |
| C.V. (US$/KPC) | 0.324 | 0.259 | 0.194 | 0.162 | 0.129 | 0.097 | 0.065 | 0.049 | 0.032 | 0.025 | 0.020 | 0.013 | 0.007 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 40.838 | 81.675 | 102.095 | 122.513 | 142.933 | 163.351 | 173.561 | 183.770 | 187.854 | 191.938 | 196.022 | 200.106 | 204.190 | 209,104 |
| C.V. (US$/KPC) | 0.910 | 0.729 | 0.546 | 0.455 | 0.364 | 0.273 | 0.182 | 0.137 | 0.092 | 0.073 | 0.054 | 0.036 | 0.019 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 38.392 | 76.784 | 95.979 | 115.175 | 134.371 | 153.567 | 163.166 | 172.763 | 176.603 | 180.441 | 184.281 | 188.119 | 191.959 | 290,664 |
| C.V. (US$/KPC) | 0.628 | 0.502 | 0.377 | 0.313 | 0.251 | 0.188 | 0.126 | 0.094 | 0.062 | 0.050 | 0.037 | 0.025 | 0.012 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 56.533 | 113.065 | 141.331 | 169.597 | 197.864 | 226.130 | 240.263 | 254.397 | 260.050 | 265.702 | 271.357 | 277.009 | 282.663 | 409,785 |
| C.V. (US$/KPC) | 0.891 | 0.713 | 0.535 | 0.446 | 0.356 | 0.267 | 0.178 | 0.134 | 0.089 | 0.072 | 0.053 | 0.036 | 0.017 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 31.149 | 62.297 | 77.872 | 93.446 | 109.020 | 124.596 | 132.383 | 140.170 | 143.285 | 146.400 | 149.515 | 152.630 | 155.744 | 121,815 |
| C.V. (US$/KPC) | 0.534 | 0.426 | 0.320 | 0.267 | 0.214 | 0.161 | 0.106 | 0.080 | 0.053 | 0.042 | 0.032 | 0.021 | 0.011 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 34.230 | 68.458 | 85.573 | 102.688 | 119.803 | 136.918 | 145.475 | 154.033 | 157.456 | 160.879 | 164.302 | 167.725 | 171.148 | 125,740 |
| C.V. (US$/KPC) | 0.540 | 0.431 | 0.324 | 0.269 | 0.216 | 0.162 | 0.108 | 0.081 | 0.054 | 0.044 | 0.032 | 0.021 | 0.011 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 47.192 | 94.383 | 117.979 | 141.575 | 165.170 | 188.766 | 200.564 | 212.362 | 217.081 | 221.800 | 226.519 | 231.239 | 235.957 | 443,486 |
| C.V. (US$/KPC) | 1.038 | 0.830 | 0.622 | 0.519 | 0.415 | 0.312 | 0.207 | 0.155 | 0.104 | 0.084 | 0.062 | 0.041 | 0.021 | - | |
| Cargos Estampilla Ramales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.911 | 13.825 | 17.279 | 20.736 | 24.192 | 27.647 | 29.376 | 31.103 | 31.794 | 32.486 | 33.176 | 33.867 | 34.560 | 48,210 |
| C.V. (US$/KPC) | 0.158 | 0.126 | 0.094 | 0.078 | 0.064 | 0.048 | 0.032 | 0.024 | 0.016 | 0.013 | 0.009 | 0.007 | 0.003 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5.474 | 10.947 | 13.684 | 16.419 | 19.156 | 21.893 | 23.261 | 24.630 | 25.178 | 25.725 | 26.272 | 26.820 | 27.367 | 14,352 |
| C.V. (US$/KPC) | 0.121 | 0.097 | 0.073 | 0.060 | 0.048 | 0.036 | 0.024 | 0.019 | 0.012 | 0.009 | 0.007 | 0.005 | 0.003 | - | - |
| SABANA Tarifa plena SIN delta cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 24.772 | 49.542 | 61.928 | 74.314 | 86.700 | 99.086 | 105.279 | 111.472 | 113.949 | 116.425 | 118.903 | 121.380 | 123.858 | 231,327 |
| C.V. (US$/KPC) | 0.520 | 0.417 | 0.312 | 0.260 | 0.208 | 0.157 | 0.104 | 0.078 | 0.052 | 0.041 | 0.032 | 0.021 | 0.011 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,381,696 |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
ACTUALIZADOS A DICIEMBRE DE 2022
APLICABLE DEL 1° DE ENERO A 14 DE MAYO DE 2023
Nota: En cumplimiento con lo estipulado en el Artículo 15 de la Resolución CREG 126 de 2010 y teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al «cargo por estampilla ramales».
Cargos para servicio de transporte en firme resolución CREG 003/2018 y CREG 106/2018 con IPP e IPC Oficial a Dic de 2021 Aplicado a 2022
| % de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% | CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 58.213 | 116.427 | 145.533 | 174.641 | 203.748 | 232.854 | 247.408 | 261.961 | 267.782 | 273.604 | 279.425 | 285.246 | 291.068 | 638,744 |
| C.V. (US$/KPC) | 1.462 | 1.169 | 0.877 | 0.730 | 0.584 | 0.439 | 0.293 | 0.219 | 0.146 | 0.116 | 0.088 | 0.059 | 0.029 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 16.409 | 32.818 | 41.022 | 49.226 | 57.431 | 65.635 | 69.737 | 73.841 | 75.481 | 77.122 | 78.763 | 80.404 | 82.045 | 151,349 |
| C.V. (US$/KPC) | 0.595 | 0.477 | 0.358 | 0.298 | 0.238 | 0.179 | 0.119 | 0.089 | 0.060 | 0.048 | 0.036 | 0.023 | 0.012 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.775 | 13.552 | 16.940 | 20.327 | 23.715 | 27.103 | 28.797 | 30.490 | 31.168 | 31.846 | 32.523 | 33.201 | 33.878 | 44,013 |
| C.V. (US$/KPC) | 0.332 | 0.266 | 0.198 | 0.165 | 0.132 | 0.099 | 0.066 | 0.050 | 0.033 | 0.027 | 0.020 | 0.013 | 0.006 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 15.721 | 31.442 | 39.303 | 47.163 | 55.024 | 62.885 | 66.815 | 70.746 | 72.318 | 73.890 | 75.462 | 77.033 | 78.605 | 114,759 |
| C.V. (US$/KPC) | 0.380 | 0.304 | 0.228 | 0.190 | 0.152 | 0.114 | 0.076 | 0.058 | 0.038 | 0.031 | 0.023 | 0.015 | 0.007 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 33.268 | 66.537 | 83.171 | 99.805 | 116.440 | 133.073 | 141.390 | 149.708 | 153.034 | 156.361 | 159.688 | 163.015 | 166.341 | 389,295 |
| C.V. (US$/KPC) | 0.874 | 0.698 | 0.524 | 0.436 | 0.349 | 0.262 | 0.175 | 0.131 | 0.087 | 0.070 | 0.053 | 0.036 | 0.017 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 11.691 | 23.382 | 29.227 | 35.073 | 40.918 | 46.764 | 49.686 | 52.609 | 53.778 | 54.947 | 56.116 | 57.284 | 58.454 | 132,885 |
| C.V. (US$/KPC) | 0.326 | 0.261 | 0.195 | 0.163 | 0.130 | 0.098 | 0.065 | 0.049 | 0.033 | 0.026 | 0.020 | 0.013 | 0.006 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 26.870 | 53.741 | 67.175 | 80.611 | 94.047 | 107.481 | 114.199 | 120.917 | 123.603 | 126.290 | 128.978 | 131.665 | 134.352 | 295,776 |
| C.V. (US$/KPC) | 0.784 | 0.627 | 0.470 | 0.392 | 0.314 | 0.235 | 0.157 | 0.118 | 0.078 | 0.062 | 0.047 | 0.032 | 0.016 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 56.678 | 113.355 | 141.694 | 170.033 | 198.372 | 226.709 | 240.879 | 255.048 | 260.716 | 266.384 | 272.052 | 277.719 | 283.387 | 285,039 |
| C.V. (US$/KPC) | 0.948 | 0.758 | 0.568 | 0.474 | 0.379 | 0.284 | 0.190 | 0.142 | 0.094 | 0.076 | 0.056 | 0.038 | 0.018 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 105.172 | 210.344 | 262.930 | 315.516 | 368.102 | 420.687 | 446.980 | 473.273 | 483.790 | 494.307 | 504.826 | 515.343 | 525.860 | 671,244 |
| C.V. (US$/KPC) | 1.844 | 1.475 | 1.106 | 0.923 | 0.738 | 0.554 | 0.369 | 0.277 | 0.185 | 0.147 | 0.110 | 0.074 | 0.037 | - | |
| Montañuelo - Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 2,106.078 | 4,212.155 | 5,265.193 | 6,318.233 | 7,371.271 | 8,424.310 | 8,950.829 | 9,477.349 | 9,687.957 | 9,898.565 | 10,109.172 | 10,319.780 | 10,530.388 | 17,356,362 |
| C.V. (US$/KPC) | 33.235 | 26.588 | 19.940 | 16.617 | 13.293 | 9.971 | 6.647 | 4.985 | 3.324 | 2.659 | 1.995 | 1.329 | 0.665 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 25.521 | 51.041 | 63.801 | 76.562 | 89.321 | 102.082 | 108.462 | 114.842 | 117.394 | 119.946 | 122.498 | 125.050 | 127.603 | 81,645 |
| C.V. (US$/KPC) | 0.609 | 0.486 | 0.365 | 0.304 | 0.244 | 0.183 | 0.121 | 0.092 | 0.061 | 0.049 | 0.037 | 0.025 | 0.012 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 13.608 | 27.217 | 34.020 | 40.824 | 47.629 | 54.432 | 57.835 | 61.237 | 62.597 | 63.958 | 65.319 | 66.679 | 68.040 | 57,332 |
| C.V. (US$/KPC) | 0.299 | 0.239 | 0.179 | 0.149 | 0.119 | 0.089 | 0.060 | 0.045 | 0.029 | 0.023 | 0.018 | 0.012 | 0.006 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 37.698 | 75.395 | 94.245 | 113.094 | 131.943 | 150.792 | 160.216 | 169.641 | 173.410 | 177.180 | 180.950 | 184.720 | 188.490 | 184,847 |
| C.V. (US$/KPC) | 0.840 | 0.673 | 0.504 | 0.420 | 0.336 | 0.252 | 0.168 | 0.126 | 0.085 | 0.067 | 0.050 | 0.033 | 0.017 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 35.440 | 70.881 | 88.599 | 106.320 | 124.040 | 141.760 | 150.620 | 159.480 | 163.024 | 166.568 | 170.112 | 173.656 | 177.200 | 256,946 |
| C.V. (US$/KPC) | 0.580 | 0.463 | 0.348 | 0.289 | 0.232 | 0.174 | 0.116 | 0.087 | 0.058 | 0.047 | 0.034 | 0.023 | 0.011 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 52.186 | 104.371 | 130.465 | 156.558 | 182.651 | 208.744 | 221.790 | 234.837 | 240.055 | 245.274 | 250.493 | 255.711 | 260.930 | 362,248 |
| C.V. (US$/KPC) | 0.822 | 0.658 | 0.494 | 0.412 | 0.328 | 0.246 | 0.164 | 0.124 | 0.082 | 0.066 | 0.049 | 0.033 | 0.016 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 28.754 | 57.507 | 71.885 | 86.262 | 100.638 | 115.016 | 122.204 | 129.393 | 132.268 | 135.144 | 138.019 | 140.895 | 143.769 | 107,684 |
| C.V. (US$/KPC) | 0.493 | 0.393 | 0.295 | 0.246 | 0.197 | 0.148 | 0.098 | 0.074 | 0.049 | 0.039 | 0.029 | 0.020 | 0.010 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 31.598 | 63.195 | 78.994 | 94.793 | 110.592 | 126.391 | 134.290 | 142.190 | 145.350 | 148.509 | 151.669 | 154.829 | 157.989 | 111,153 |
| C.V. (US$/KPC) | 0.499 | 0.398 | 0.299 | 0.249 | 0.200 | 0.149 | 0.099 | 0.075 | 0.050 | 0.040 | 0.029 | 0.020 | 0.010 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 43.563 | 87.127 | 108.908 | 130.690 | 152.471 | 174.252 | 185.143 | 196.034 | 200.391 | 204.746 | 209.103 | 213.460 | 217.816 | 392,040 |
| C.V. (US$/KPC) | 0.958 | 0.766 | 0.575 | 0.479 | 0.383 | 0.288 | 0.191 | 0.143 | 0.096 | 0.077 | 0.058 | 0.038 | 0.020 | - | |
| Cargos Estampilla Ramales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.380 | 12.762 | 15.951 | 19.141 | 22.332 | 25.521 | 27.117 | 28.711 | 29.350 | 29.988 | 30.625 | 31.264 | 31.903 | 42,617 |
| C.V. (US$/KPC) | 0.146 | 0.116 | 0.087 | 0.072 | 0.059 | 0.044 | 0.029 | 0.022 | 0.015 | 0.012 | 0.009 | 0.006 | 0.002 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5.053 | 10.105 | 12.632 | 15.157 | 17.683 | 20.210 | 21.473 | 22.736 | 23.242 | 23.747 | 24.252 | 24.758 | 25.262 | 12,687 |
| C.V. (US$/KPC) | 0.111 | 0.089 | 0.067 | 0.055 | 0.044 | 0.033 | 0.022 | 0.017 | 0.011 | 0.009 | 0.006 | 0.005 | 0.002 | - | - |
| SABANA Tarifa plena SIN delta cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 22.867 | 45.733 | 57.167 | 68.600 | 80.034 | 91.468 | 97.184 | 102.901 | 105.187 | 107.474 | 109.761 | 112.047 | 114.335 | 204,492 |
| C.V. (US$/KPC) | 0.480 | 0.385 | 0.288 | 0.240 | 0.192 | 0.145 | 0.096 | 0.072 | 0.048 | 0.038 | 0.029 | 0.020 | 0.010 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 1,221,413 |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
ACTUALIZADOS A DICIEMBRE DE 2021
APLICABLE AL AÑO 2022
Nota:
En cumplimiento con lo estipulado en el Artículo 15 de la Resolución CREG 126 de 2010 y teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Cargos para servicio de transporte en firme - Resolución CREG 003/2018 y CREG 106/2018 con IPP e IPC oficial a DIC DE 2020 APLICADO A 2021
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% |
CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 54.634 | 109.269 | 136.585 | 163.903 | 191.220 | 218.537 | 232.196 | 245.854 | 251.317 | 256.781 | 262.245 | 267.708 | 273.172 | 604746 |
| C.V. (US$/KPC) | 1.372 | 1.097 | 0.823 | 0.685 | 0.548 | 0.412 | 0.275 | 0.206 | 0.137 | 0.109 | 0.083 | 0.055 | 0.028 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 15.400 | 30.800 | 38.500 | 46.200 | 53.900 | 61.600 | 65.450 | 69.301 | 70.840 | 72.380 | 73.921 | 75.460 | 77.000 | 143293 |
| C.V. (US$/KPC) | 0.559 | 0.447 | 0.336 | 0.279 | 0.223 | 0.168 | 0.112 | 0.084 | 0.056 | 0.045 | 0.033 | 0.022 | 0.011 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.359 | 12.719 | 15.898 | 19.078 | 22.257 | 25.436 | 27.027 | 28.616 | 29.252 | 29.887 | 30.523 | 31.159 | 31.795 | 41671 |
| C.V. (US$/KPC) | 0.312 | 0.250 | 0.186 | 0.155 | 0.124 | 0.093 | 0.062 | 0.047 | 0.031 | 0.025 | 0.018 | 0.013 | 0.006 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14.754 | 29.509 | 36.887 | 44.263 | 51.641 | 59.018 | 62.707 | 66.396 | 67.871 | 69.347 | 70.822 | 72.297 | 73.772 | 108650 |
| C.V. (US$/KPC) | 0.356 | 0.285 | 0.214 | 0.178 | 0.143 | 0.107 | 0.071 | 0.054 | 0.036 | 0.029 | 0.022 | 0.014 | 0.007 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 31.222 | 62.446 | 78.057 | 93.669 | 109.280 | 124.891 | 132.696 | 140.503 | 143.625 | 146.747 | 149.870 | 152.992 | 156.114 | 368574 |
| C.V. (US$/KPC) | 0.820 | 0.655 | 0.492 | 0.409 | 0.328 | 0.246 | 0.164 | 0.123 | 0.082 | 0.066 | 0.049 | 0.033 | 0.016 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 10.972 | 21.944 | 27.430 | 32.916 | 38.402 | 43.888 | 46.631 | 49.374 | 50.471 | 51.568 | 52.665 | 53.762 | 54.860 | 125812 |
| C.V. (US$/KPC) | 0.306 | 0.245 | 0.183 | 0.153 | 0.122 | 0.092 | 0.061 | 0.046 | 0.031 | 0.024 | 0.018 | 0.013 | 0.006 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 25.218 | 50.437 | 63.045 | 75.655 | 88.264 | 100.873 | 107.177 | 113.482 | 116.004 | 118.525 | 121.048 | 123.570 | 126.092 | 280033 |
| C.V. (US$/KPC) | 0.736 | 0.589 | 0.442 | 0.368 | 0.294 | 0.221 | 0.147 | 0.110 | 0.074 | 0.059 | 0.044 | 0.030 | 0.015 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 53.193 | 106.385 | 132.982 | 159.578 | 186.175 | 212.770 | 226.068 | 239.367 | 244.686 | 250.005 | 255.325 | 260.644 | 265.963 | 269867 |
| C.V. (US$/KPC) | 0.890 | 0.712 | 0.534 | 0.445 | 0.355 | 0.267 | 0.178 | 0.133 | 0.089 | 0.071 | 0.053 | 0.036 | 0.017 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 98.705 | 197.411 | 246.764 | 296.116 | 345.469 | 394.821 | 419.498 | 444.174 | 454.044 | 463.915 | 473.787 | 483.657 | 493.528 | 635516 |
| C.V. (US$/KPC) | 1.731 | 1.384 | 1.038 | 0.866 | 0.692 | 0.520 | 0.346 | 0.260 | 0.174 | 0.138 | 0.103 | 0.069 | 0.034 | - | |
| Montañuelo - Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 1976586 | 3953171 | 4941463 | 5929757 | 6918049 | 7906341 | 8400487 | 8894635 | 9092293 | 9289952 | 9487610 | 9685269 | 9882927 | 16.432.538 |
| C.V. (US$/KPC) | 31.191 | 24.953 | 18.714 | 15.596 | 12.476 | 9.358 | 6.238 | 4.679 | 3.120 | 2.495 | 1.872 | 1.248 | 0.624 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 23.952 | 47.903 | 59.878 | 71.854 | 83.829 | 95.805 | 101.794 | 107.781 | 110.176 | 112.571 | 114.967 | 117.362 | 119.757 | 77300 |
| C.V. (US$/KPC) | 0.571 | 0.456 | 0.343 | 0.285 | 0.229 | 0.171 | 0.114 | 0.086 | 0.057 | 0.046 | 0.034 | 0.023 | 0.011 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 12.772 | 25.543 | 31.929 | 38.314 | 44.700 | 51.085 | 54.279 | 57.472 | 58.748 | 60.026 | 61.303 | 62.580 | 63.857 | 54281 |
| C.V. (US$/KPC) | 0.281 | 0.224 | 0.168 | 0.140 | 0.112 | 0.084 | 0.056 | 0.043 | 0.028 | 0.022 | 0.017 | 0.011 | 0.006 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 35.380 | 70.760 | 88.450 | 106.140 | 123.831 | 141.521 | 150.365 | 159.210 | 162.748 | 166.287 | 169.825 | 173.363 | 176.901 | 175008 |
| C.V. (US$/KPC) | 0.789 | 0.631 | 0.473 | 0.394 | 0.315 | 0.237 | 0.158 | 0.118 | 0.079 | 0.063 | 0.047 | 0.031 | 0.016 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 33.261 | 66.522 | 83.152 | 99.782 | 116.413 | 133.044 | 141.360 | 149.674 | 153.001 | 156.326 | 159.653 | 162.978 | 166.305 | 243269 |
| C.V. (US$/KPC) | 0.544 | 0.435 | 0.327 | 0.271 | 0.217 | 0.163 | 0.109 | 0.082 | 0.054 | 0.044 | 0.032 | 0.022 | 0.010 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 48.978 | 97.954 | 122.443 | 146.932 | 171.421 | 195.910 | 208.153 | 220.398 | 225.296 | 230.193 | 235.091 | 239.989 | 244.887 | 342967 |
| C.V. (US$/KPC) | 0.772 | 0.617 | 0.463 | 0.386 | 0.308 | 0.231 | 0.154 | 0.116 | 0.077 | 0.062 | 0.046 | 0.031 | 0.015 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 26.986 | 53.972 | 67.465 | 80.958 | 94.451 | 107.944 | 114.691 | 121.437 | 124.136 | 126.834 | 129.533 | 132.232 | 134.929 | 101953 |
| C.V. (US$/KPC) | 0.462 | 0.369 | 0.277 | 0.231 | 0.185 | 0.139 | 0.092 | 0.069 | 0.046 | 0.037 | 0.028 | 0.018 | 0.009 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 29.655 | 59.309 | 74.137 | 88.964 | 103.792 | 118.620 | 126.033 | 133.447 | 136.413 | 139.378 | 142.344 | 145.309 | 148.275 | 105237 |
| C.V. (US$/KPC) | 0.468 | 0.374 | 0.281 | 0.233 | 0.187 | 0.140 | 0.093 | 0.070 | 0.047 | 0.038 | 0.028 | 0.018 | 0.009 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 40.885 | 81.770 | 102.212 | 122.655 | 143.096 | 163.538 | 173.760 | 183.981 | 188.070 | 192.157 | 196.246 | 200.335 | 204.423 | 371173 |
| C.V. (US$/KPC) | 0.899 | 0.719 | 0.539 | 0.450 | 0.360 | 0.270 | 0.179 | 0.135 | 0.090 | 0.072 | 0.054 | 0.036 | 0.018 | - | |
| Cargos Estampilla Ramales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5.987 | 11.977 | 14.970 | 17.964 | 20.959 | 23.952 | 25.450 | 26.946 | 27.545 | 28.144 | 28.742 | 29.341 | 29.942 | 40349 |
| C.V. (US$/KPC) | 0.137 | 0.109 | 0.082 | 0.068 | 0.055 | 0.041 | 0.028 | 0.021 | 0.014 | 0.011 | 0.008 | 0.006 | 0.002 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 4.742 | 9.484 | 11.855 | 14.225 | 16.596 | 18.967 | 20.153 | 21.338 | 21.813 | 22.287 | 22.761 | 23.235 | 23.709 | 12012 |
| C.V. (US$/KPC) | 0.105 | 0.084 | 0.063 | 0.052 | 0.041 | 0.031 | 0.021 | 0.016 | 0.010 | 0.008 | 0.006 | 0.005 | 0.002 | - | - |
| SABANA Tarifa plena SIN delta cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 21.461 | 42.921 | 53.652 | 64.383 | 75.113 | 85.844 | 91.209 | 96.574 | 98.720 | 100.866 | 103.012 | 105.158 | 107.305 | 193608 |
| C.V. (US$/KPC) | 0.451 | 0.361 | 0.270 | 0.225 | 0.181 | 0.136 | 0.090 | 0.068 | 0.045 | 0.036 | 0.028 | 0.018 | 0.009 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. (US$/KPCD-año) | 1156401 | ||||||||||||||
| C.V. (US$/KPC) | |||||||||||||||
ACTUALIZADOS A DICIEMBRE DE 2020
APLICABLE AL AÑO 2021
Nota: En cumplimiento con lo estipulado en el Artículo 15 de la Resolución CREG 126 de 2010 y teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Cargos para servicio de transporte en firme - Resolución CREG 003/2018 y CREG 106/2018
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% |
CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 53.937 | 107.875 | 134.843 | 161.812 | 188.781 | 215.749 | 229.234 | 242.718 | 248.111 | 253.506 | 258.899 | 264.293 | 269.687 | 595,114 |
| C.V. (US$/KPC) | 1.354 | 1.083 | 0.813 | 0.677 | 0.541 | 0.406 | 0.271 | 0.203 | 0.135 | 0.108 | 0.082 | 0.054 | 0.027 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 15.204 | 30.408 | 38.009 | 45.610 | 53.213 | 60.814 | 64.615 | 68.416 | 69.937 | 71.457 | 72.978 | 74.498 | 76.018 | 141,011 |
| C.V. (US$/KPC) | 0.552 | 0.442 | 0.331 | 0.276 | 0.220 | 0.166 | 0.110 | 0.083 | 0.056 | 0.044 | 0.033 | 0.022 | 0.011 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6.278 | 12.556 | 15.695 | 18.834 | 21.973 | 25.112 | 26.682 | 28.251 | 28.878 | 29.506 | 30.134 | 30.762 | 31.390 | 41,007 |
| C.V. (US$/KPC) | 0.308 | 0.246 | 0.184 | 0.153 | 0.123 | 0.092 | 0.061 | 0.047 | 0.031 | 0.025 | 0.018 | 0.012 | 0.006 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14.566 | 29.133 | 36.416 | 43.699 | 50.982 | 58.265 | 61.907 | 65.549 | 67.005 | 68.462 | 69.918 | 71.375 | 72.831 | 106,92 |
| C.V. (US$/KPC) | 0.352 | 0.282 | 0.211 | 0.176 | 0.141 | 0.106 | 0.070 | 0.053 | 0.035 | 0.028 | 0.022 | 0.014 | 0.007 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 30.824 | 61.650 | 77.061 | 92.474 | 107.886 | 123.298 | 131.004 | 138.711 | 141.793 | 144.875 | 147.958 | 151.040 | 154.122 | 362,704 |
| C.V. (US$/KPC) | 0.809 | 0.647 | 0.486 | 0.404 | 0.324 | 0.243 | 0.162 | 0.121 | 0.081 | 0.065 | 0.049 | 0.033 | 0.016 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 10.832 | 21.664 | 27.080 | 32.496 | 37.912 | 43.328 | 46.036 | 48.745 | 49.828 | 50.910 | 51.993 | 53.076 | 54.161 | 123,808 |
| C.V. (US$/KPC) | 0.302 | 0.242 | 0.180 | 0.151 | 0.120 | 0.091 | 0.060 | 0.045 | 0.031 | 0.024 | 0.018 | 0.012 | 0.006 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 24.896 | 49.793 | 62.241 | 74.690 | 87.138 | 99.586 | 105.810 | 112.034 | 114.524 | 117.013 | 119.504 | 121.994 | 124.483 | 275,573 |
| C.V. (US$/KPC) | 0.727 | 0.581 | 0.436 | 0.363 | 0.291 | 0.218 | 0.145 | 0.109 | 0.073 | 0.058 | 0.043 | 0.030 | 0.015 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 52.515 | 105.028 | 131.285 | 157.542 | 183.800 | 210.056 | 223.185 | 236.313 | 241.565 | 246.816 | 252.068 | 257.319 | 262.570 | 265,569 |
| C.V. (US$/KPC) | 0.879 | 0.703 | 0.527 | 0.439 | 0.351 | 0.263 | 0.176 | 0.132 | 0.087 | 0.070 | 0.052 | 0.035 | 0.017 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 97.446 | 194.893 | 243.616 | 292.339 | 341.062 | 389.785 | 414.146 | 438.508 | 448.252 | 457.997 | 467.743 | 477.487 | 487.232 | 625,394 |
| C.V. (US$/KPC) | 1.708 | 1.367 | 1.025 | 0.855 | 0.683 | 0.513 | 0.342 | 0.257 | 0.171 | 0.136 | 0.102 | 0.068 | 0.034 | - | |
| Montañuelo - Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 1,951.372 | 3,902.742 | 4,878.427 | 5,854.113 | 6,829.799 | 7,805.484 | 8,293.327 | 8,781.170 | 8,976.307 | 9,171.444 | 9,366.581 | 9,561.718 | 9,756.855 | 16,170.814 |
| C.V. (US$/KPC) | 30.794 | 24.635 | 18.475 | 15.397 | 12.317 | 9.238 | 6.158 | 4.619 | 3.080 | 2.463 | 1.848 | 1.232 | 0.616 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 23.646 | 47.291 | 59.115 | 70.938 | 82.760 | 94.583 | 100.495 | 106.406 | 108.771 | 111.135 | 113.500 | 115.865 | 118.229 | 76,068 |
| C.V. (US$/KPC) | 0.564 | 0.451 | 0.338 | 0.282 | 0.226 | 0.169 | 0.112 | 0.085 | 0.057 | 0.045 | 0.034 | 0.023 | 0.011 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 12.609 | 25.217 | 31.521 | 37.825 | 44.130 | 50.434 | 53.586 | 56.739 | 57.999 | 59.260 | 60.521 | 61.781 | 63.042 | 53,416 |
| C.V. (US$/KPC) | 0.277 | 0.221 | 0.166 | 0.138 | 0.110 | 0.083 | 0.056 | 0.042 | 0.027 | 0.022 | 0.017 | 0.011 | 0.006 | - | |
| El Porvenir - La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 34.929 | 69.857 | 87.322 | 104.786 | 122.251 | 139.715 | 148.447 | 157.179 | 160.672 | 164.165 | 167.658 | 171.151 | 174.644 | 172,221 |
| C.V. (US$/KPC) | 0.779 | 0.623 | 0.467 | 0.389 | 0.311 | 0.234 | 0.156 | 0.117 | 0.078 | 0.062 | 0.047 | 0.031 | 0.016 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 32.837 | 65.674 | 82.091 | 98.510 | 114.928 | 131.347 | 139.556 | 147.765 | 151.049 | 154.332 | 157.616 | 160.899 | 164.183 | 239,395 |
| C.V. (US$/KPC) | 0.537 | 0.429 | 0.322 | 0.268 | 0.215 | 0.161 | 0.108 | 0.081 | 0.053 | 0.043 | 0.032 | 0.022 | 0.010 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 48.353 | 96.705 | 120.881 | 145.058 | 169.234 | 193.410 | 205.498 | 217.587 | 222.422 | 227.257 | 232.092 | 236.927 | 241.763 | 337,505 |
| C.V. (US$/KPC) | 0.762 | 0.610 | 0.457 | 0.381 | 0.304 | 0.228 | 0.152 | 0.115 | 0.076 | 0.061 | 0.045 | 0.031 | 0.015 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 26.642 | 53.283 | 66.605 | 79.925 | 93.246 | 106.567 | 113.228 | 119.888 | 122.552 | 125.216 | 127.881 | 130.545 | 133.208 | 100,329 |
| C.V. (US$/KPC) | 0.456 | 0.364 | 0.274 | 0.228 | 0.183 | 0.137 | 0.091 | 0.068 | 0.045 | 0.036 | 0.027 | 0.018 | 0.009 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 29.277 | 58.553 | 73.191 | 87.830 | 102.468 | 117.107 | 124.425 | 131.745 | 134.673 | 137.600 | 140.528 | 143.456 | 146.383 | 103,561 |
| C.V. (US$/KPC) | 0.462 | 0.369 | 0.277 | 0.230 | 0.185 | 0.138 | 0.092 | 0.069 | 0.047 | 0.037 | 0.027 | 0.018 | 0.009 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 40.363 | 80.727 | 100.908 | 121.090 | 141.270 | 161.452 | 171.543 | 181.634 | 185.671 | 189.706 | 193.743 | 197.780 | 201.815 | 365,261 |
| C.V. (US$/KPC) | 0.888 | 0.710 | 0.532 | 0.444 | 0.355 | 0.267 | 0.177 | 0.133 | 0.089 | 0.072 | 0.053 | 0.035 | 0.018 | - | |
| Cargos Estampilla Ramales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5.911 | 11.824 | 14.779 | 17.735 | 20.691 | 23.646 | 25.125 | 26.602 | 27.194 | 27.785 | 28.376 | 28.967 | 29.560 | 39,706 |
| C.V. (US$/KPC) | 0.135 | 0.108 | 0.081 | 0.067 | 0.054 | 0.041 | 0.027 | 0.020 | 0.014 | 0.011 | 0.008 | 0.006 | 0.002 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 4.682 | 9.363 | 11.704 | 14.044 | 16.384 | 18.725 | 19.896 | 21.066 | 21.535 | 22.003 | 22.470 | 22.939 | 23.407 | 11,82 |
| C.V. (US$/KPC) | 0.103 | 0.083 | 0.062 | 0.051 | 0.041 | 0.031 | 0.020 | 0.016 | 0.010 | 0.008 | 0.006 | 0.005 | 0.002 | - | - |
| SABANA Tarifa plena SIN delta cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 21.187 | 42.374 | 52.967 | 63.561 | 74.155 | 84.749 | 90.046 | 95.342 | 97.461 | 99.579 | 101.698 | 103.817 | 105.936 | 190,524 |
| C.V. (US$/KPC) | 0.445 | 0.356 | 0.267 | 0.223 | 0.178 | 0.134 | 0.089 | 0.067 | 0.044 | 0.035 | 0.027 | 0.018 | 0.009 | - | - |
| Gasoducto del Ariari | |||||||||||||||
| C.F. (US$/KPCD-año) | 1,137,983 | ||||||||||||||
| C.V. (US$/KPC) | |||||||||||||||
ACTUALIZADOS A DICIEMBRE DE 2019
APLICABLE AL AÑO 2020
Nota: En cumplimiento con lo estipulado en el Artículo 15 de la Resolución CREG 126 de 2010 y teniendo en cuenta que el proyecto de construcción del gasoducto ramal Loop Chinchiná – Santa Rosa – Dosquebradas no está disponible para su operación, TGI S.A. ESP procedió a aplicar, hasta el momento en que el proyecto esté efectivamente disponible para su operación, un descuento por delta cargos a todos los contratos que incluyen el componente tarifario correspondiente al “cargo por estampilla ramales”.
Cargos para Servicio según Resolución CREG 003/2018 y CREG 106/2018
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% | 20% | 40% | 50% | 60% | 70% | 80% | 85% | 90% | 92% | 94% | 96% | 98% | 100% |
CARGO AO&M ($/KPCD/A) |
| 100% | 80% | 60% | 50% | 40% | 30% | 20% | 15% | 10% | 8% | 6% | 4% | 2% | 0% | ||
| Ballena – Barranca | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 53,179 | 106,36 | 132,949 | 159,539 | 186,13 | 212,719 | 226,014 | 239,309 | 244,627 | 249,945 | 255,263 | 260,581 | 265,899 | 573.374 |
| C.V. (US$/KPC) | 1,335 | 1,068 | 0,801 | 0,667 | 0,534 | 0,401 | 0,268 | 0,2 | 0,133 | 0,106 | 0,081 | 0,054 | 0,027 | - | |
| Barranca – Sebastopol | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14,99 | 29,981 | 37,475 | 44,97 | 52,465 | 59,96 | 63,707 | 67,456 | 68,954 | 70,453 | 71,953 | 73,451 | 74,95 | 135.859 |
| C.V. (US$/KPC) | 0,544 | 0,435 | 0,327 | 0,272 | 0,217 | 0,163 | 0,109 | 0,082 | 0,055 | 0,044 | 0,032 | 0,021 | 0,011 | - | |
| Sebastopol – Vasconia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 6,19 | 12,38 | 15,475 | 18,57 | 21,664 | 24,759 | 26,307 | 27,854 | 28,473 | 29,092 | 29,711 | 30,33 | 30,949 | 39.509 |
| C.V. (US$/KPC) | 0,303 | 0,243 | 0,181 | 0,151 | 0,121 | 0,091 | 0,06 | 0,046 | 0,03 | 0,025 | 0,018 | 0,012 | 0,006 | - | |
| Vasconia – Mariquita | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 14,361 | 28,724 | 35,905 | 43,085 | 50,266 | 57,447 | 61,038 | 64,628 | 66,064 | 67,5 | 68,936 | 70,372 | 71,808 | 103.014 |
| C.V. (US$/KPC) | 0,347 | 0,278 | 0,208 | 0,173 | 0,139 | 0,104 | 0,069 | 0,053 | 0,035 | 0,028 | 0,021 | 0,013 | 0,007 | - | |
| Mariquita – Pereira | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 30,391 | 60,784 | 75,979 | 91,175 | 106,371 | 121,566 | 129,164 | 136,762 | 139,801 | 142,84 | 145,88 | 148,919 | 151,957 | 349.454 |
| C.V. (US$/KPC) | 0,798 | 0,638 | 0,479 | 0,398 | 0,319 | 0,24 | 0,16 | 0,12 | 0,079 | 0,064 | 0,048 | 0,032 | 0,016 | - | |
| Pereira – Armenia | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 10,68 | 21,36 | 26,7 | 32,04 | 37,38 | 42,72 | 45,389 | 48,06 | 49,128 | 50,195 | 51,263 | 52,331 | 53,4 | 119.285 |
| C.V. (US$/KPC) | 0,298 | 0,238 | 0,178 | 0,149 | 0,119 | 0,09 | 0,059 | 0,045 | 0,03 | 0,024 | 0,018 | 0,012 | 0,006 | - | |
| Armenia – Cali | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 24,546 | 49,094 | 61,367 | 73,641 | 85,914 | 98,187 | 104,324 | 110,461 | 112,915 | 115,37 | 117,826 | 120,28 | 122,735 | 265.506 |
| C.V. (US$/KPC) | 0,716 | 0,573 | 0,43 | 0,358 | 0,287 | 0,215 | 0,143 | 0,107 | 0,072 | 0,057 | 0,043 | 0,029 | 0,015 | - | |
| Mariquita – Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 51,777 | 103,553 | 129,441 | 155,33 | 181,218 | 207,106 | 220,05 | 232,994 | 238,172 | 243,35 | 248,527 | 253,705 | 258,883 | 255.868 |
| C.V. (US$/KPC) | 0,866 | 0,693 | 0,519 | 0,433 | 0,346 | 0,26 | 0,173 | 0,13 | 0,086 | 0,069 | 0,051 | 0,035 | 0,017 | - | |
| Gualanday – Neiva | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 96,077 | 192,156 | 240,194 | 288,233 | 336,272 | 384,31 | 408,33 | 432,349 | 441,957 | 451,564 | 461,173 | 470,781 | 480,389 | 602.547 |
| C.V. (US$/KPC) | 1,684 | 1,348 | 1,011 | 0,843 | 0,674 | 0,506 | 0,337 | 0,253 | 0,169 | 0,134 | 0,101 | 0,067 | 0,034 | - | |
| Montañuelo - Gualanday | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 1.923,97 | 3.847,93 | 4.809,91 | 5.771,89 | 6.733,88 | 7.695,86 | 8.176,85 | 8.657,84 | 8.850,24 | 9.042,63 | 9.235,03 | 9.427,43 | 9.619,82 | 15.580,08 |
| C.V. (US$/KPC) | 30,361 | 24,289 | 18,216 | 15,181 | 12,144 | 9,109 | 6,072 | 4,554 | 3,037 | 2,429 | 1,822 | 1,214 | 0,608 | - | |
| Vasconia – La Belleza | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 23,314 | 46,627 | 58,284 | 69,941 | 81,597 | 93,255 | 99,084 | 104,912 | 107,243 | 109,574 | 111,906 | 114,237 | 116,569 | 73.290 |
| C.V. (US$/KPC) | 0,556 | 0,444 | 0,334 | 0,278 | 0,223 | 0,167 | 0,111 | 0,084 | 0,056 | 0,045 | 0,034 | 0,022 | 0,011 | - | |
| La Belleza – Cogua | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 12,432 | 24,863 | 31,078 | 37,294 | 43,51 | 49,725 | 52,834 | 55,942 | 57,184 | 58,428 | 59,671 | 60,913 | 62,157 | 51.465 |
| C.V. (US$/KPC) | 0,273 | 0,218 | 0,163 | 0,137 | 0,109 | 0,082 | 0,055 | 0,041 | 0,027 | 0,021 | 0,017 | 0,011 | 0,006 | - | |
| La Belleza – El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 34,439 | 68,876 | 86,096 | 103,314 | 120,534 | 137,753 | 146,362 | 154,972 | 158,416 | 161,86 | 165,304 | 168,748 | 172,191 | 165.929 |
| C.V. (US$/KPC) | 0,768 | 0,614 | 0,46 | 0,384 | 0,307 | 0,231 | 0,153 | 0,115 | 0,077 | 0,062 | 0,046 | 0,03 | 0,016 | - | |
| Cusiana – Apiay | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 32,376 | 64,751 | 80,938 | 97,126 | 113,314 | 129,502 | 137,596 | 145,69 | 148,928 | 152,165 | 155,403 | 158,639 | 161,877 | 230.649 |
| C.V. (US$/KPC) | 0,529 | 0,423 | 0,318 | 0,264 | 0,212 | 0,159 | 0,106 | 0,079 | 0,053 | 0,043 | 0,031 | 0,021 | 0,01 | - | |
| Apiay – Usme | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 47,674 | 95,346 | 119,183 | 143,02 | 166,857 | 190,694 | 202,612 | 214,531 | 219,298 | 224,065 | 228,833 | 233,6 | 238,368 | 325.175 |
| C.V. (US$/KPC) | 0,751 | 0,601 | 0,451 | 0,376 | 0,3 | 0,225 | 0,15 | 0,113 | 0,075 | 0,06 | 0,045 | 0,03 | 0,015 | - | |
| Apiay – Villavicencio – Ocoa | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 26,268 | 52,535 | 65,669 | 78,803 | 91,936 | 105,071 | 111,637 | 118,204 | 120,831 | 123,458 | 126,085 | 128,712 | 131,337 | 96.664 |
| C.V. (US$/KPC) | 0,45 | 0,359 | 0,27 | 0,225 | 0,18 | 0,135 | 0,09 | 0,067 | 0,045 | 0,036 | 0,027 | 0,018 | 0,009 | - | |
| Gasoducto Morichal – Yopal | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 28,866 | 57,73 | 72,163 | 86,596 | 101,029 | 115,462 | 122,678 | 129,895 | 132,781 | 135,668 | 138,554 | 141,441 | 144,327 | 99.778 |
| C.V. (US$/KPC) | 0,456 | 0,364 | 0,273 | 0,227 | 0,182 | 0,137 | 0,091 | 0,068 | 0,046 | 0,037 | 0,027 | 0,018 | 0,009 | - | |
| Ramales Boyacá – Santander | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 39,796 | 79,593 | 99,491 | 119,389 | 139,286 | 159,185 | 169,134 | 179,083 | 183,063 | 187,042 | 191,022 | 195,002 | 198,981 | 351.917 |
| C.V. (US$/KPC) | 0,875 | 0,7 | 0,525 | 0,438 | 0,35 | 0,263 | 0,175 | 0,131 | 0,087 | 0,071 | 0,053 | 0,035 | 0,018 | - | |
| Cargos Estampilla Ramales con Delta Cargos | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 5,828 | 11,658 | 14,572 | 17,486 | 20,401 | 23,314 | 24,773 | 26,229 | 26,812 | 27,395 | 27,977 | 28,56 | 29,144 | 38.256 |
| C.V. (US$/KPC) | 0,133 | 0,106 | 0,079 | 0,066 | 0,054 | 0,04 | 0,027 | 0,02 | 0,013 | 0,011 | 0,008 | 0,006 | 0,002 | - | |
| Cargos Estampilla Gasoductos Principales | |||||||||||||||
| C.F. (US$/KPCD-año) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| C.V. (US$/KPC) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | |
| Cusiana - El Porvenir | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 4,616 | 9,232 | 11,54 | 13,846 | 16,154 | 18,462 | 19,616 | 20,77 | 21,232 | 21,694 | 22,155 | 22,617 | 23,078 | 11.389 |
| C.V. (US$/KPC) | 0,102 | 0,082 | 0,062 | 0,05 | 0,04 | 0,03 | 0,02 | 0,016 | 0,01 | 0,008 | 0,006 | 0,004 | 0,002 | - | |
| Gasoducto de la Sabana | |||||||||||||||
| C.F. (US$/KPCD-año) | - | 20,89 | 41,779 | 52,224 | 62,668 | 73,113 | 83,558 | 88,781 | 94,003 | 96,092 | 98,18 | 100,27 | 102,359 | 104,448 | 183.564 |
| C.V. (US$/KPC) | 0,439 | 0,351 | 0,263 | 0,219 | 0,176 | 0,132 | 0,087 | 0,066 | 0,044 | 0,035 | 0,027 | 0,018 | 0,009 | - | - |
ACTUALIZADOS A DICIEMBRE DE 2018
APLICABLE AL AÑO 2019
Cargos para Servicio según Resolución CREG 104/2017
ACTUALIZADOS A DICIEMBRE DE 2016
APLICABLE AL AÑO 2017
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% |
20% |
40% |
50% |
60% |
70% |
80% |
85% |
90% |
92% |
94% |
96% |
98% |
100% |
CARGO AO&M ($/KPCD/A) |
|
100% |
80% |
60% |
50% |
40% |
30% |
20% |
15% |
10% |
8% |
6% |
4% |
2% |
0% |
||
|
Ballena – Barranca |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
51,998 |
103,996 |
129,995 |
155,994 |
181,993 |
207,992 |
220,992 |
233,991 |
239,190 |
244,391 |
249,590 |
254,790 |
259,990 |
555.685 |
|
C.V. (US$/KPC) |
1,306 |
1,044 |
0,784 |
0,652 |
0,522 |
0,392 |
0,262 |
0,196 |
0,130 |
0,104 |
0,079 |
0,053 |
0,026 |
- |
|
|
Barranca – Sebastopol |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
14,657 |
29,314 |
36,642 |
43,970 |
51,299 |
58,627 |
62,291 |
65,957 |
67,422 |
68,887 |
70,354 |
71,819 |
73,285 |
131.668 |
|
C.V. (US$/KPC) |
0,532 |
0,426 |
0,320 |
0,266 |
0,212 |
0,160 |
0,106 |
0,080 |
0,054 |
0,043 |
0,032 |
0,021 |
0,011 |
- |
|
|
Sebastopol – Vasconia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
6,052 |
12,105 |
15,131 |
18,157 |
21,183 |
24,209 |
25,722 |
27,235 |
27,840 |
28,445 |
29,051 |
29,656 |
30,261 |
38.290 |
|
C.V. (US$/KPC) |
0,297 |
0,237 |
0,177 |
0,148 |
0,118 |
0,089 |
0,059 |
0,045 |
0,030 |
0,024 |
0,018 |
0,012 |
0,005 |
- |
|
|
Vasconia – Mariquita |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
14,042 |
28,085 |
35,107 |
42,127 |
49,149 |
56,171 |
59,681 |
63,192 |
64,596 |
66,000 |
67,404 |
68,809 |
70,213 |
99.836 |
|
C.V. (US$/KPC) |
0,339 |
0,271 |
0,204 |
0,170 |
0,136 |
0,102 |
0,068 |
0,051 |
0,034 |
0,027 |
0,021 |
0,013 |
0,007 |
- |
|
|
Mariquita – Pereira |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
29,716 |
59,433 |
74,290 |
89,149 |
104,007 |
118,865 |
126,293 |
133,723 |
136,695 |
139,666 |
142,638 |
145,609 |
148,581 |
338.673 |
|
C.V. (US$/KPC) |
0,780 |
0,624 |
0,468 |
0,390 |
0,312 |
0,234 |
0,156 |
0,117 |
0,078 |
0,062 |
0,047 |
0,032 |
0,015 |
- |
|
|
Pereira – Armenia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
10,443 |
20,885 |
26,107 |
31,328 |
36,549 |
41,771 |
44,381 |
46,992 |
48,036 |
49,080 |
50,124 |
51,168 |
52,213 |
115.605 |
|
C.V. (US$/KPC) |
0,291 |
0,233 |
0,174 |
0,146 |
0,116 |
0,088 |
0,058 |
0,044 |
0,030 |
0,023 |
0,018 |
0,012 |
0,005 |
- |
|
|
Armenia – Cali |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
24,001 |
48,003 |
60,003 |
72,004 |
84,005 |
96,005 |
102,006 |
108,006 |
110,406 |
112,806 |
115,207 |
117,607 |
120,007 |
257.315 |
|
C.V. (US$/KPC) |
0,700 |
0,560 |
0,420 |
0,350 |
0,280 |
0,210 |
0,140 |
0,105 |
0,070 |
0,056 |
0,042 |
0,028 |
0,014 |
- |
|
|
Mariquita – Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
50,626 |
101,252 |
126,565 |
151,878 |
177,191 |
202,503 |
215,160 |
227,817 |
232,879 |
237,942 |
243,004 |
248,067 |
253,130 |
247.974 |
|
C.V. (US$/KPC) |
0,847 |
0,677 |
0,508 |
0,424 |
0,338 |
0,254 |
0,170 |
0,127 |
0,084 |
0,068 |
0,050 |
0,034 |
0,016 |
- |
|
|
Gualanday – Neiva |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
93,942 |
187,886 |
234,857 |
281,828 |
328,799 |
375,770 |
399,256 |
422,741 |
432,135 |
441,530 |
450,925 |
460,319 |
469,713 |
583.958 |
|
C.V. (US$/KPC) |
1,647 |
1,318 |
0,988 |
0,824 |
0,659 |
0,495 |
0,329 |
0,247 |
0,165 |
0,131 |
0,098 |
0,066 |
0,033 |
- |
|
|
Montañuelo - Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
1.881,210 |
3.762,419 |
4.703,023 |
5.643,629 |
6.584,233 |
7.524,837 |
7.995,139 |
8.465,443 |
8.653,564 |
8.841,685 |
9.029,805 |
9.217,926 |
9.406,047 |
15.099.419 |
|
C.V. (US$/KPC) |
29,686 |
23,749 |
17,811 |
14,843 |
11,874 |
8,906 |
5,937 |
4,453 |
2,969 |
2,375 |
1,782 |
1,187 |
0,594 |
- |
|
|
Vasconia – La Belleza |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
22,796 |
45,591 |
56,989 |
68,387 |
79,784 |
91,182 |
96,882 |
102,580 |
104,860 |
107,139 |
109,419 |
111,699 |
113,978 |
71.029 |
|
C.V. (US$/KPC) |
0,544 |
0,434 |
0,326 |
0,271 |
0,218 |
0,163 |
0,108 |
0,082 |
0,055 |
0,044 |
0,033 |
0,022 |
0,011 |
- |
|
|
La Belleza – Cogua |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
12,155 |
24,311 |
30,388 |
36,465 |
42,543 |
48,620 |
51,659 |
54,699 |
55,913 |
57,129 |
58,345 |
59,560 |
60,776 |
49.877 |
|
C.V. (US$/KPC) |
0,267 |
0,213 |
0,160 |
0,134 |
0,106 |
0,080 |
0,054 |
0,040 |
0,026 |
0,021 |
0,016 |
0,011 |
0,005 |
- |
|
|
La Belleza – El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
33,673 |
67,345 |
84,182 |
101,019 |
117,856 |
134,692 |
143,110 |
151,528 |
154,895 |
158,263 |
161,630 |
164,998 |
168,365 |
160.810 |
|
C.V. (US$/KPC) |
0,751 |
0,601 |
0,450 |
0,375 |
0,300 |
0,225 |
0,150 |
0,113 |
0,076 |
0,060 |
0,045 |
0,030 |
0,015 |
- |
|
|
Cusiana – Apiay |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
31,656 |
63,313 |
79,140 |
94,968 |
110,796 |
126,624 |
134,539 |
142,452 |
145,618 |
148,783 |
151,949 |
155,114 |
158,280 |
223.534 |
|
C.V. (US$/KPC) |
0,518 |
0,414 |
0,311 |
0,258 |
0,207 |
0,155 |
0,104 |
0,078 |
0,051 |
0,042 |
0,031 |
0,021 |
0,010 |
- |
|
|
Apiay – Usme |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
46,614 |
93,228 |
116,535 |
139,842 |
163,149 |
186,456 |
198,109 |
209,763 |
214,424 |
219,085 |
223,748 |
228,409 |
233,071 |
315.143 |
|
C.V. (US$/KPC) |
0,734 |
0,588 |
0,441 |
0,368 |
0,293 |
0,220 |
0,147 |
0,111 |
0,073 |
0,059 |
0,044 |
0,030 |
0,014 |
- |
|
|
Apiay – Villavicencio – Ocoa |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
25,684 |
51,367 |
64,210 |
77,051 |
89,893 |
102,736 |
109,156 |
115,577 |
118,146 |
120,714 |
123,283 |
125,851 |
128,419 |
93.682 |
|
C.V. (US$/KPC) |
0,440 |
0,351 |
0,264 |
0,220 |
0,176 |
0,132 |
0,088 |
0,066 |
0,044 |
0,035 |
0,026 |
0,018 |
0,009 |
- |
|
|
Gasoducto Morichal – Yopal |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
28,224 |
56,447 |
70,560 |
84,672 |
98,784 |
112,896 |
119,951 |
127,008 |
129,831 |
132,653 |
135,475 |
138,298 |
141,120 |
96.699 |
|
C.V. (US$/KPC) |
0,445 |
0,356 |
0,267 |
0,222 |
0,178 |
0,134 |
0,089 |
0,067 |
0,045 |
0,036 |
0,026 |
0,018 |
0,009 |
- |
|
|
Ramales Boyacá – Santander |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
38,912 |
77,824 |
97,280 |
116,736 |
136,191 |
155,647 |
165,375 |
175,103 |
178,995 |
182,885 |
186,777 |
190,669 |
194,559 |
341.061 |
|
C.V. (US$/KPC) |
0,856 |
0,684 |
0,513 |
0,428 |
0,343 |
0,257 |
0,171 |
0,128 |
0,085 |
0,069 |
0,051 |
0,034 |
0,018 |
- |
|
|
Cargos Estampilla Ramales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
5,412 |
10,823 |
13,529 |
16,235 |
18,942 |
21,647 |
23,001 |
24,353 |
24,894 |
25,436 |
25,976 |
26,518 |
27,060 |
37.562 |
|
C.V. (US$/KPC) |
0,124 |
0,098 |
0,074 |
0,061 |
0,050 |
0,037 |
0,025 |
0,019 |
0,012 |
0,010 |
0,008 |
0,005 |
0,002 |
- |
|
|
Cargos Estampilla Gasoductos Principales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
C.V. (US$/KPC) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cusiana - El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
4,513 |
9,027 |
11,283 |
13,539 |
15,795 |
18,052 |
19,180 |
20,309 |
20,761 |
21,211 |
21,662 |
22,114 |
22,565 |
11.037 |
|
C.V. (US$/KPC) |
0,100 |
0,080 |
0,060 |
0,049 |
0,039 |
0,030 |
0,020 |
0,015 |
0,010 |
0,008 |
0,005 |
0,004 |
0,002 |
- |
- |
|
Gasoducto de la Sabana |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
20,426 |
40,850 |
51,063 |
61,276 |
71,489 |
81,702 |
86,808 |
91,914 |
93,956 |
95,999 |
98,042 |
100,084 |
102,127 |
177.901 |
|
C.V. (US$/KPC) |
0,429 |
0,344 |
0,257 |
0,215 |
0,172 |
0,129 |
0,085 |
0,065 |
0,043 |
0,034 |
0,026 |
0,018 |
0,009 |
- |
- |
Nota: Valores expresados en dólares y pesos del 31 de diciembre de 2017 aplicables al año 2018, los cuales serán actualizados de acuerdo con lo establecido en la Resolución CREG 126 de 2010.
Estos cargos no incluyen el impuesto de transporte de que trata el Artículo 26 de la Ley 141 de 1994. ni la cuota de fomento establecida por el Artículo 15 de la Ley 401 de 1997.
Las cifras decimales se separan con coma (,) y las cifras de miles se separan con punto (.).
Para establecer cargos fijos y variables aplicables en un punto determinado. se suman los cargos fijos y variables por distancia de cada tramo con los cargos fijos y variables por estampilla establecidos para el grupo de gasoductos ramales.
Para el gasoducto Morichal – Yopal no se suman los cargos fijos y variables por estampilla.
Para el cargo estampilla ramales se presentan las tarifas CON delta cargos en las cuales se aplican los descuentos por delta cargos del Gasoducto Ramales Loop Armenia y Loop Chinchiná – Santa Rosa – Dosquebradas, tarifa utilizada hasta la entrada en operación de este proyecto
Cuando una misma capacidad (KPCD) y un mismo volumen KPC sea contratado y transportado respectivamente para varios remitentes. los cargos estampilla se distribuirán entre los remitentes así: 1.) de mutuo acuerdo entre los remitentes. para lo cual disponen del mismo tiempo previsto en la Resolución CREG 126 de 2010 para efectos de negociar nuevos cargos y 2.) si no hay mutuo acuerdo. los cargos estampilla serán asumidos por cada remitente en forma proporcional a la longitud de gasoducto que utilice cada remitente.
Cargos para Servicio según Resolución CREG 261/2016
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% |
20% |
40% |
50% |
60% |
70% |
80% |
85% |
90% |
92% |
94% |
96% |
98% |
100% |
CARGO AO&M ($/KPCD/A) |
|
100% |
80% |
60% |
50% |
40% |
30% |
20% |
15% |
10% |
8% |
6% |
4% |
2% |
0% |
||
|
Ballena – Barranca |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
51,483 |
102,966 |
128,707 |
154,449 |
180,190 |
205,931 |
218,803 |
231,673 |
236,821 |
241,970 |
247,118 |
252,266 |
257,415 |
533.873 |
|
C.V. (US$/KPC) |
1,293 |
1,034 |
0,776 |
0,646 |
0,517 |
0,388 |
0,259 |
0,194 |
0,129 |
0,103 |
0,078 |
0,052 |
0,026 |
- |
|
|
Barranca – Sebastopol |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
14,512 |
29,024 |
36,279 |
43,535 |
50,791 |
58,047 |
61,674 |
65,303 |
66,754 |
68,205 |
69,657 |
71,108 |
72,559 |
126.500 |
|
C.V. (US$/KPC) |
0,527 |
0,421 |
0,316 |
0,263 |
0,210 |
0,158 |
0,105 |
0,079 |
0,053 |
0,042 |
0,031 |
0,021 |
0,011 |
- |
|
|
Sebastopol – Vasconia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
5,992 |
11,985 |
14,981 |
17,977 |
20,973 |
23,969 |
25,468 |
26,965 |
27,564 |
28,164 |
28,763 |
29,362 |
29,961 |
36.787 |
|
C.V. (US$/KPC) |
0,294 |
0,235 |
0,176 |
0,146 |
0,117 |
0,088 |
0,059 |
0,044 |
0,029 |
0,024 |
0,017 |
0,012 |
0,005 |
- |
|
|
Vasconia – Mariquita |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
13,903 |
27,807 |
34,759 |
41,710 |
48,662 |
55,614 |
59,090 |
62,566 |
63,956 |
65,346 |
66,737 |
68,127 |
69,517 |
95.917 |
|
C.V. (US$/KPC) |
0,336 |
0,269 |
0,202 |
0,168 |
0,134 |
0,101 |
0,067 |
0,051 |
0,034 |
0,027 |
0,021 |
0,013 |
0,007 |
- |
|
|
Mariquita – Pereira |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
29,422 |
58,844 |
73,554 |
88,266 |
102,977 |
117,687 |
125,042 |
132,398 |
135,340 |
138,282 |
141,225 |
144,167 |
147,109 |
325.380 |
|
C.V. (US$/KPC) |
0,773 |
0,618 |
0,464 |
0,386 |
0,309 |
0,232 |
0,155 |
0,116 |
0,077 |
0,062 |
0,047 |
0,031 |
0,015 |
- |
|
|
Pereira – Armenia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
10,339 |
20,678 |
25,848 |
31,018 |
36,187 |
41,357 |
43,941 |
46,526 |
47,560 |
48,594 |
49,627 |
50,661 |
51,696 |
111.067 |
|
C.V. (US$/KPC) |
0,288 |
0,231 |
0,172 |
0,144 |
0,115 |
0,087 |
0,057 |
0,043 |
0,029 |
0,023 |
0,017 |
0,012 |
0,005 |
- |
|
|
Armenia – Cali |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
23,763 |
47,528 |
59,409 |
71,291 |
83,173 |
95,054 |
100,995 |
106,936 |
109,312 |
111,689 |
114,066 |
116,442 |
118,818 |
247.215 |
|
C.V. (US$/KPC) |
0,693 |
0,555 |
0,416 |
0,347 |
0,277 |
0,208 |
0,139 |
0,104 |
0,069 |
0,055 |
0,041 |
0,028 |
0,014 |
- |
|
|
Mariquita – Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
50,125 |
100,249 |
125,311 |
150,373 |
175,436 |
200,497 |
213,028 |
225,560 |
230,572 |
235,585 |
240,597 |
245,610 |
250,622 |
238.241 |
|
C.V. (US$/KPC) |
0,839 |
0,671 |
0,503 |
0,419 |
0,335 |
0,251 |
0,168 |
0,126 |
0,083 |
0,067 |
0,050 |
0,034 |
0,016 |
- |
|
|
Gualanday – Neiva |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
93,012 |
186,024 |
232,530 |
279,036 |
325,542 |
372,047 |
395,300 |
418,553 |
427,854 |
437,156 |
446,458 |
455,759 |
465,060 |
561.037 |
|
C.V. (US$/KPC) |
1,631 |
1,305 |
0,978 |
0,816 |
0,652 |
0,490 |
0,326 |
0,245 |
0,164 |
0,130 |
0,098 |
0,065 |
0,033 |
- |
|
|
Montañuelo - Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
1.862,573 |
3.725,145 |
4.656,431 |
5.587,718 |
6.519,004 |
7.450,291 |
7.915,934 |
8.381,578 |
8.567,835 |
8.754,092 |
8.940,349 |
9.126,607 |
9.312,864 |
14.506.752 |
|
C.V. (US$/KPC) |
29,392 |
23,514 |
17,635 |
14,696 |
11,756 |
8,818 |
5,878 |
4,409 |
2,940 |
2,351 |
1,764 |
1,176 |
0,588 |
- |
|
|
Vasconia – La Belleza |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
22,570 |
45,139 |
56,425 |
67,710 |
78,994 |
90,279 |
95,922 |
101,564 |
103,821 |
106,078 |
108,335 |
110,592 |
112,849 |
68.241 |
|
C.V. (US$/KPC) |
0,539 |
0,430 |
0,323 |
0,269 |
0,216 |
0,161 |
0,107 |
0,081 |
0,054 |
0,043 |
0,033 |
0,022 |
0,011 |
- |
|
|
La Belleza – Cogua |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
12,035 |
24,070 |
30,087 |
36,104 |
42,122 |
48,139 |
51,148 |
54,157 |
55,359 |
56,563 |
57,767 |
58,970 |
60,174 |
47.919 |
|
C.V. (US$/KPC) |
0,264 |
0,211 |
0,158 |
0,132 |
0,105 |
0,079 |
0,053 |
0,040 |
0,026 |
0,021 |
0,016 |
0,011 |
0,005 |
- |
|
|
La Belleza – El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
33,340 |
66,678 |
83,349 |
100,018 |
116,688 |
133,357 |
141,692 |
150,027 |
153,361 |
156,695 |
160,029 |
163,363 |
166,697 |
154.498 |
|
C.V. (US$/KPC) |
0,743 |
0,595 |
0,445 |
0,372 |
0,297 |
0,223 |
0,148 |
0,112 |
0,075 |
0,060 |
0,044 |
0,029 |
0,015 |
- |
|
|
Cusiana – Apiay |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
31,343 |
62,685 |
78,356 |
94,027 |
109,698 |
125,370 |
133,206 |
141,041 |
144,176 |
147,309 |
150,444 |
153,577 |
156,712 |
214.760 |
|
C.V. (US$/KPC) |
0,513 |
0,410 |
0,308 |
0,256 |
0,205 |
0,154 |
0,103 |
0,077 |
0,051 |
0,041 |
0,030 |
0,021 |
0,010 |
- |
|
|
Apiay – Usme |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
46,153 |
92,304 |
115,380 |
138,457 |
161,533 |
184,609 |
196,147 |
207,685 |
212,300 |
216,915 |
221,531 |
226,146 |
230,762 |
302.774 |
|
C.V. (US$/KPC) |
0,727 |
0,582 |
0,437 |
0,364 |
0,290 |
0,218 |
0,145 |
0,109 |
0,073 |
0,059 |
0,043 |
0,029 |
0,014 |
- |
|
|
Apiay – Villavicencio – Ocoa |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
25,430 |
50,858 |
63,574 |
76,288 |
89,002 |
101,718 |
108,075 |
114,432 |
116,975 |
119,518 |
122,061 |
124,605 |
127,147 |
90.004 |
|
C.V. (US$/KPC) |
0,436 |
0,348 |
0,261 |
0,218 |
0,174 |
0,131 |
0,087 |
0,065 |
0,043 |
0,035 |
0,026 |
0,017 |
0,009 |
- |
|
|
Gasoducto Morichal – Yopal |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
27,945 |
55,888 |
69,861 |
83,833 |
97,805 |
111,778 |
118,763 |
125,750 |
128,544 |
131,339 |
134,133 |
136,928 |
139,722 |
92.904 |
|
C.V. (US$/KPC) |
0,441 |
0,352 |
0,264 |
0,220 |
0,177 |
0,132 |
0,088 |
0,066 |
0,044 |
0,036 |
0,026 |
0,017 |
0,009 |
- |
|
|
Ramales Boyacá – Santander |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
38,527 |
77,053 |
96,316 |
115,580 |
134,842 |
154,105 |
163,737 |
173,368 |
177,222 |
181,074 |
184,927 |
188,780 |
192,632 |
327.674 |
|
C.V. (US$/KPC) |
0,847 |
0,677 |
0,508 |
0,424 |
0,339 |
0,255 |
0,169 |
0,127 |
0,085 |
0,068 |
0,051 |
0,034 |
0,017 |
- |
|
|
Cargos Estampilla Ramales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
4,657 |
9,315 |
11,643 |
13,972 |
16,301 |
18,629 |
19,793 |
20,958 |
21,423 |
21,889 |
22,355 |
22,821 |
23,288 |
34.145 |
|
C.V. (US$/KPC) |
0,107 |
0,086 |
0,064 |
0,053 |
0,043 |
0,033 |
0,022 |
0,016 |
0,011 |
0,009 |
0,007 |
0,004 |
0,002 |
- |
|
|
Cargos Estampilla Gasoductos Principales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
&nbsnbsp; C.V. (US$/KPC) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cusiana - El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
4,469 |
8,937 |
11,171 |
13,405 |
15,639 |
17,873 |
18,990 |
20,107 |
20,555 |
21,001 |
21,448 |
21,895 |
22,342 |
10.604 |
|
C.V. (US$/KPC) |
0,099 |
0,079 |
0,060 |
0,049 |
0,039 |
0,029 |
0,020 |
0,015 |
0,010 |
0,008 |
0,005 |
0,004 |
0,002 |
- |
- |
|
Gasoducto de la Sabana |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
20,223 |
40,446 |
50,557 |
60,669 |
70,780 |
80,892 |
85,948 |
91,004 |
93,026 |
95,048 |
97,071 |
99,092 |
101,115 |
170.918 |
|
C.V. (US$/KPC) |
0,425 |
0,340 |
0,255 |
0,212 |
0,170 |
0,128 |
0,085 |
0,064 |
0,042 |
0,034 |
0,026 |
0,017 |
0,009 |
- |
- |
ACTUALIZADOS A DICIEMBRE DE 2016
APLICABLE AL AÑO 2017
Nota:
Valores expresados en dólares y pesos del 31 de diciembre de 2016 aplicables al año 2017, los cuales serán actualizados de acuerdo con lo establecido en la Resolución CREG 126 de 2010.
- Estos cargos no incluyen el impuesto de transporte de que trata el Artículo 26 de la Ley 141 de 1994. ni la cuota de fomento establecida por el Artículo 15 de la Ley 401 de 1997.
- Las cifras decimales se separan con coma (,) y las cifras de miles se separan con punto (.).
- Para establecer cargos fijos y variables aplicables en un punto determinado. se suman los cargos fijos y variables por distancia de cada tramo con los cargos fijos y variables por estampilla establecidos para el grupo de gasoductos ramales.
- Para el gasoducto Morichal – Yopal no se suman los cargos fijos y variables por estampilla.
- Para el cargo estampilla ramales se presentan las tarifas CON delta cargos en las cuales se aplican los descuentos por delta cargos del Gasoducto Ramales Loop Armenia y Loop Chinchiná – Santa Rosa – Dosquebradas, tarifa utilizada hasta la entrada en operación de este proyecto
- Cuando una misma capacidad (KPCD) y un mismo volumen KPC sea contratado y transportado respectivamente para varios remitentes. los cargos estampilla se distribuirán entre los remitentes así:
- De mutuo acuerdo entre los remitentes. para lo cual disponen del mismo tiempo previsto en la Resolución CREG 126 de 2010 para efectos de negociar nuevos cargos.
- Si no hay mutuo acuerdo. los cargos estampilla serán asumidos por cada remitente en forma proporcional a la longitud de gasoducto que utilice cada remitente.
Cargos para Servicio según Resolución CREG 160/2014
|
% de la Inversión Base Remunerada con Cargo Fijo |
0% |
20% |
40% |
50% |
60% |
70% |
80% |
85% |
90% |
92% |
94% |
96% |
98% |
100% |
CARGO AO&M ($/KPCD/A) |
|
100% |
80% |
60% |
50% |
40% |
30% |
20% |
15% |
10% |
8% |
6% |
4% |
2% |
0% |
||
|
Ballena – Barranca |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
51,483 |
102,966 |
128,707 |
154,449 |
180,190 |
205,931 |
218,803 |
231,673 |
236,821 |
241,970 |
247,118 |
252,266 |
257,415 |
533.873 |
|
C.V. (US$/KPC) |
1,293 |
1,034 |
0,776 |
0,646 |
0,517 |
0,388 |
0,259 |
0,194 |
0,129 |
0,103 |
0,078 |
0,052 |
0,026 |
- |
|
|
Barranca – Sebastopol |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
14,512 |
29,024 |
36,279 |
43,535 |
50,791 |
58,047 |
61,674 |
65,303 |
66,754 |
68,205 |
69,657 |
71,108 |
72,559 |
126.500 |
|
C.V. (US$/KPC) |
0,527 |
0,421 |
0,316 |
0,263 |
0,210 |
0,158 |
0,105 |
0,079 |
0,053 |
0,042 |
0,031 |
0,021 |
0,011 |
- |
|
|
Sebastopol – Vasconia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
5,992 |
11,985 |
14,981 |
17,977 |
20,973 |
23,969 |
25,468 |
26,965 |
27,564 |
28,164 |
28,763 |
29,362 |
29,961 |
36.787 |
|
C.V. (US$/KPC) |
0,294 |
0,235 |
0,176 |
0,146 |
0,117 |
0,088 |
0,059 |
0,044 |
0,029 |
0,024 |
0,017 |
0,012 |
0,005 |
- |
|
|
Vasconia – Mariquita |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
13,903 |
27,807 |
34,759 |
41,710 |
48,662 |
55,614 |
59,090 |
62,566 |
63,956 |
65,346 |
66,737 |
68,127 |
69,517 |
95.917 |
|
C.V. (US$/KPC) |
0,336 |
0,269 |
0,202 |
0,168 |
0,134 |
0,101 |
0,067 |
0,051 |
0,034 |
0,027 |
0,021 |
0,013 |
0,007 |
- |
|
|
Mariquita – Pereira |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
29,422 |
58,844 |
73,554 |
88,266 |
102,977 |
117,687 |
125,042 |
132,398 |
135,340 |
138,282 |
141,225 |
144,167 |
147,109 |
325.380 |
|
C.V. (US$/KPC) |
0,773 |
0,618 |
0,464 |
0,386 |
0,309 |
0,232 |
0,155 |
0,116 |
0,077 |
0,062 |
0,047 |
0,031 |
0,015 |
- |
|
|
Pereira – Armenia |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
10,339 |
20,678 |
25,848 |
31,018 |
36,187 |
41,357 |
43,941 |
46,526 |
47,560 |
48,594 |
49,627 |
50,661 |
51,696 |
111.067 |
|
C.V. (US$/KPC) |
0,288 |
0,231 |
0,172 |
0,144 |
0,115 |
0,087 |
0,057 |
0,043 |
0,029 |
0,023 |
0,017 |
0,012 |
0,005 |
- |
|
|
Armenia – Cali |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
23,763 |
47,528 |
59,409 |
71,291 |
83,173 |
95,054 |
100,995 |
106,936 |
109,312 |
111,689 |
114,066 |
116,442 |
118,818 |
247.215 |
|
C.V. (US$/KPC) |
0,693 |
0,555 |
0,416 |
0,347 |
0,277 |
0,208 |
0,139 |
0,104 |
0,069 |
0,055 |
0,041 |
0,028 |
0,014 |
- |
|
|
Mariquita – Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
50,125 |
100,249 |
125,311 |
150,373 |
175,436 |
200,497 |
213,028 |
225,560 |
230,572 |
235,585 |
240,597 |
245,610 |
250,622 |
238.241 |
|
C.V. (US$/KPC) |
0,839 |
0,671 |
0,503 |
0,419 |
0,335 |
0,251 |
0,168 |
0,126 |
0,083 |
0,067 |
0,050 |
0,034 |
0,016 |
- |
|
|
Gualanday – Neiva |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
93,012 |
186,024 |
232,530 |
279,036 |
325,542 |
372,047 |
395,300 |
418,553 |
427,854 |
437,156 |
446,458 |
455,759 |
465,060 |
561.037 |
|
C.V. (US$/KPC) |
1,631 |
1,305 |
0,978 |
0,816 |
0,652 |
0,490 |
0,326 |
0,245 |
0,164 |
0,130 |
0,098 |
0,065 |
0,033 |
- |
|
|
Montañuelo - Gualanday |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
1.862,573 |
3.725,145 |
4.656,431 |
5.587,718 |
6.519,004 |
7.450,291 |
7.915,934 |
8.381,578 |
8.567,835 |
8.754,092 |
8.940,349 |
9.126,607 |
9.312,864 |
14.506.752 |
|
C.V. (US$/KPC) |
29,392 |
23,514 |
17,635 |
14,696 |
11,756 |
8,818 |
5,878 |
4,409 |
2,940 |
2,351 |
1,764 |
1,176 |
0,588 |
- |
|
|
Vasconia – La Belleza |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
22,570 |
45,139 |
56,425 |
67,710 |
78,994 |
90,279 |
95,922 |
101,564 |
103,821 |
106,078 |
108,335 |
110,592 |
112,849 |
68.241 |
|
C.V. (US$/KPC) |
0,539 |
0,430 |
0,323 |
0,269 |
0,216 |
0,161 |
0,107 |
0,081 |
0,054 |
0,043 |
0,033 |
0,022 |
0,011 |
- |
|
|
La Belleza – Cogua |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
12,035 |
24,070 |
30,087 |
36,104 |
42,122 |
48,139 |
51,148 |
54,157 |
55,359 |
56,563 |
57,767 |
58,970 |
60,174 |
47.919 |
|
C.V. (US$/KPC) |
0,264 |
0,211 |
0,158 |
0,132 |
0,105 |
0,079 |
0,053 |
0,040 |
0,026 |
0,021 |
0,016 |
0,011 |
0,005 |
- |
|
|
La Belleza – El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
33,340 |
66,678 |
83,349 |
100,018 |
116,688 |
133,357 |
141,692 |
150,027 |
153,361 |
156,695 |
160,029 |
163,363 |
166,697 |
154.498 |
|
C.V. (US$/KPC) |
0,743 |
0,595 |
0,445 |
0,372 |
0,297 |
0,223 |
0,148 |
0,112 |
0,075 |
0,060 |
0,044 |
0,029 |
0,015 |
- |
|
|
Cusiana – Apiay |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
41,517 |
83,034 |
103,793 |
124,550 |
145,309 |
166,067 |
176,447 |
186,826 |
190,978 |
195,129 |
199,281 |
203,434 |
207,585 |
214.760 |
|
C.V. (US$/KPC) |
0,677 |
0,542 |
0,406 |
0,339 |
0,271 |
0,204 |
0,135 |
0,102 |
0,068 |
0,054 |
0,041 |
0,027 |
0,014 |
- |
|
|
Apiay – Usme |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
28,863 |
57,727 |
72,159 |
86,590 |
101,022 |
115,454 |
122,669 |
129,886 |
132,772 |
135,659 |
138,544 |
141,431 |
144,317 |
302.774 |
|
C.V. (US$/KPC) |
0,454 |
0,363 |
0,272 |
0,226 |
0,181 |
0,137 |
0,091 |
0,068 |
0,046 |
0,036 |
0,027 |
0,018 |
0,009 |
- |
|
|
Apiay – Villavicencio – Ocoa |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
17,585 |
35,169 |
43,961 |
52,754 |
61,545 |
70,337 |
74,733 |
79,130 |
80,888 |
82,646 |
84,405 |
86,164 |
87,922 |
90.004 |
|
C.V. (US$/KPC) |
0,301 |
0,241 |
0,181 |
0,151 |
0,120 |
0,090 |
0,061 |
0,046 |
0,030 |
0,024 |
0,018 |
0,012 |
0,007 |
- |
|
|
Gasoducto Morichal – Yopal |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
7,493 |
14,985 |
18,731 |
22,477 |
26,224 |
29,970 |
31,843 |
33,717 |
34,465 |
35,215 |
35,964 |
36,713 |
37,463 |
92.904 |
|
C.V. (US$/KPC) |
0,118 |
0,094 |
0,070 |
0,059 |
0,047 |
0,036 |
0,024 |
0,017 |
0,012 |
0,010 |
0,008 |
0,004 |
0,002 |
- |
|
|
Ramales Boyacá – Santander |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
38,527 |
77,053 |
96,316 |
115,580 |
134,842 |
154,105 |
163,737 |
173,368 |
177,222 |
181,074 |
184,927 |
188,780 |
192,632 |
327.674 |
|
C.V. (US$/KPC) |
0,847 |
0,677 |
0,508 |
0,424 |
0,339 |
0,255 |
0,169 |
0,127 |
0,085 |
0,068 |
0,051 |
0,034 |
0,017 |
- |
|
|
Cargos Estampilla Ramales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
4,500 |
9,001 |
11,250 |
13,501 |
15,752 |
18,001 |
19,126 |
20,251 |
20,700 |
21,151 |
21,600 |
22,051 |
22,502 |
34.145 |
|
C.V. (US$/KPC) |
0,104 |
0,082 |
0,062 |
0,051 |
0,042 |
0,031 |
0,022 |
0,015 |
0,011 |
0,009 |
0,005 |
0,004 |
0,002 |
- |
|
|
Cargos Estampilla Gasoductos Principales |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
C.V. (US$/KPC) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cusiana - El Porvenir |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
4,469 |
8,937 |
11,171 |
13,405 |
15,639 |
17,873 |
18,990 |
20,107 |
20,555 |
21,001 |
21,448 |
21,895 |
22,342 |
10.604 |
|
C.V. (US$/KPC) |
0,099 |
0,079 |
0,060 |
0,049 |
0,039 |
0,029 |
0,020 |
0,015 |
0,010 |
0,008 |
0,005 |
0,004 |
0,002 |
- |
- |
|
Gasoducto de la Sabana |
|||||||||||||||
|
C.F. (US$/KPCD-año) |
- |
20,223 |
40,446 |
50,557 |
60,669 |
70,780 |
80,892 |
85,948 |
91,004 |
93,026 |
95,048 |
97,071 |
99,092 |
101,115 |
170.918 |
|
C.V. (US$/KPC) |
0,425 |
0,340 |
0,255 |
0,212 |
0,170 |
0,128 |
0,085 |
0,064 |
0,042 |
0,034 |
0,026 |
0,017 |
0,009 |
- |
- |
ACTUALIZADOS A DICIEMBRE DE 2014
APLICABLE AL AÑO 2015
Nota: Valores expresados en dólares y pesos del 31 de diciembre de 2015 aplicables al año 2016, los cuales serán actualizados de acuerdo con lo establecido en la Resolución CREG 126 de 2010.
Estos cargos no incluyen el impuesto de transporte de que trata el Artículo 26 de la Ley 141 de 1994. ni la cuota de fomento establecida por el Artículo 15 de la Ley 401 de 1997.
Las cifras decimales se separan con coma (,) y las cifras de miles se separan con punto (.).
Para establecer cargos fijos y variables aplicables en un punto determinado. se suman los cargos fijos y variables por distancia de cada tramo con los cargos fijos y variables por estampilla establecidos para el grupo de gasoductos ramales.
Para el gasoducto Morichal – Yopal no se suman los cargos fijos y variables por estampilla.
Para el cargo estampilla ramales se presentan las tarifas CON delta cargos en las cuales se aplican los descuentos por delta cargos del Gasoducto ramales Loop Armenia y Loop Chinchiná – Santa Rosa – Dosquebradas, tarifa utilizada hasta la entrada en operación de este proyecto
Cuando una misma capacidad (KPCD) y un mismo volumen KPC sea contratado y transportado respectivamente para varios remitentes. los cargos estampilla se distribuirán entre los remitentes así: 1.) de mutuo acuerdo entre los remitentes. para lo cual disponen del mismo tiempo previsto en la Resolución CREG 126 de 2010 para efectos de negociar nuevos cargos y 2.) si no hay mutuo acuerdo. los cargos estampilla serán asumidos por cada remitente en forma proporcional a la longitud de gasoducto que utilice cada remitente.
Cargos:
Cargos regulados adoptados por la CREG para los tramos o grupos de gasoductos involucrados en el contrato, correspondientes a la pareja 100% variable que remunera inversión y el correspondiente cargo de AOM
Nota Preliminar:
Las tarifas de prestación del servicio, asociadas a cada modalidad, serán actualizadas en enero de cada año con el IPP WPSFD41312 de los Estados Unidos.
1. La tarifa correspondiente a la modalidad de Parqueo Flexible corresponderá a un cargo variable que está asociado a la frecuencia de uso de dos variables: frecuencia de uso (días/mes) y uso de la capacidad:
2. La tarifa correspondiente a la modalidad de Parqueo Eventual tendrá un componente fijo y una Prima Por No Uso de la capacidad contratada. Esto significa que en caso de que el remitente que haya contratado capacidad de Parqueo Eventual no use el contrato, es decir que no haga uso del servicio, se cobrará una tarifa definida como Prima por No Uso, la cual será publicada en el BEO y será sujeta de actualización anual, con el IPP de los Estados Unidos. (PPI serie WPSFD41312
Tarifa Componente Fijo (USD/KPC)
Prima por No Uso (USD/KPC)
0,844
0,318
Actualizado: Enero/2026
TARIFA OTROS SERVICIOS
Tarifa 2026
SERVICIO REGULADO DE OPERACIÓN & MANTENIMIENTO PARA NUEVOS PUNTOS DE SALIDA/ENTRADA $/mes
$ 1.731.527
SERVICIO REGULADO DE OPERACIÓN & MANTENIMIENTO PARA NUEVOS PUNTOS DE SALIDA/ENTRADA $/año
$ 20.778.309